www.healtech-electronics.com
S U P P L E M E N T A R Y M A N U A L
for iQSE-1 + QSH-P2T
PAGE
1/
3
locate the ignition coil
terminals on the right side.
Kawasaki W800
2011-
Remove the seat.
Lift up or remove the
fuel tank.
Page 1: ...altech electronics com S U P P L E M E N T A R Y M A N U A L for iQSE 1 QSH P2T PAGE 1 3 locate the ignition coil terminals on the right side Kawasaki W800 2011 Remove the seat Lift up or remove the fuel tank ...
Page 2: ...to the QSH red wire terminal and secure with tape Isolate the unused QSH green terminal with tape Splice the QSH white wire to the black wire of the coil by using the supplied red wire tap connector refet to the QSH P2T instructions S U P P L E M E N T A R Y M A N U A L for iQSE 1 QSH P2T Kawasaki W800 2011 Connect QSH black wire terminal to chassis ground ...
Page 3: ...Replace the bolt with the one supplied Tighten the bolt in this position by about 5 6 Nm If you do not have a torque wrench tighten the bolt until the shift arm is tight on the gearbox shaft For different mounting options refer to the sensor install guide S U P P L E M E N T A R Y M A N U A L for iQSE 1 QSH P2T Kawasaki W800 2011 ...