Disc-Roller
Contour
4,5 – 5,5 – 6,5 m
20-09-2020
Delivery check
Setting-up of the machine
Check :
•
the roller for any damage.
•
the roller for any paint damage during transport.
•
the hydraulic hoses for cuts and squeezing damage. Check also that the other hydraulic
components have not been damaged during transport.
•
that the frame construction has not been damaged.
•
that the transport wheel nuts are tightened and OK.
•
the air pressure in the tyres (according to the technical specifications).
•
that all wearing parts are intact.
•
that all distance clips for depth control are delivered with the machine.
•
and test the lights, (if mounted).
Check the tightening:
•
of wheel bolts x-Nm according to specifications
•
flange for towing eye
6 pcs of bolts
541 Nm
Summary of Contents for Disc-Roller Contour
Page 1: ...2 Back to the table of contents Manual no 8000001 02 200920 ...
Page 17: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 17 Back to the table of contents Noter ...
Page 28: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 28 Back to the table of contents Side sections ...
Page 40: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 40 Back to the table of contents Disc ...
Page 42: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 42 Back to the table of contents Edge equipment ...
Page 49: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 49 Back to the table of contents Notes ...
Page 55: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 55 Back to the table of contents Air brakes ...
Page 62: ...Disc Roller Contour 4 5 5 5 6 5 m 20 09 2020 62 Back to the table of contents Folding 4 5 m ...
Page 67: ...Spring Board 4 5 5 5 6 5 ...
Page 69: ...Depth controller 4 5 meter ...
Page 70: ...Debth controller 5 5 6 5 meter ...
Page 72: ...The design is subject to modification without notice ...