![HBS VBZ-3 Operating Manual Download Page 21](http://html1.mh-extra.com/html/hbs/vbz-3/vbz-3_operating-manual_2112000021.webp)
21
©HBS Bolzenschweiss-Systeme GmbH & Co. KG
All rights reserved – Reprinting, in whole or in part, only with the approval of the manufacturer
10 Preparing the Fully Automatic Stud Feeder (VBZ)
10.2 Changing-over the VBZ
Pull out the mains plug.
Disconnect connecting cable 92-40-032 from the stud welding unit.
Unplug the compressed air supply at the bush
(pos. 5)
.
Danger from moving parts
Before working on an open device, make certain that the VBZ is depres-
surised.
You can now remove the two knurled cap screws
(pos. 17)
from the separator
cage.
Remove the stud feed hose
(pos. 15)
with separator cage cover
(pos. 16)
.
Remove the studs from the feeding bowl
(pos. 10)
, the stud outlet guide
(pos. 11)
and the slide
(pos. 18)
.
Loosen the two screws
(pos. 13)
and remove the spacers
(pos. 12)
.
Pull the slide out of the separator cage (9).
Summary of Contents for VBZ-3
Page 39: ......