12 Welding
Immediately recharge the accumulators after use
.
The accumulator will be damaged if stored in uncharged condition.
A loaded accumulator will discharge itself at 5 % per month.
For recharging the accumulators connect the external power supply unit.
The power unit must not be switched on.
The LED „LADEN“ (charge) on the external power supply unit lights up
(green)
.
If the power unit is switched on, after approx. 30 minutes the sleep mode is
started; the internal energy consumption is reduced. After approx. 60 minu-
tes the power unit will be switched off
.
After automatic switch-off, switch off the power unit with the switch. The
accumulators continue to be charged, however.
Use only welding elements of one batch.
Pay strict attention not to mix welding elements from different batches.
Carry out test welds again after a batch change.
Even the slightest changes to the geometry, in particular to the tip of the
welding elements require different settings for the welding process.
Now check the quality of the welded joint before inserting a new welding
element and repeating the welding process.
Work in accordance with
point 13
.