
Electrical connection
14
A03313_02_Y00_00
HBM: public
PW29
Cable protection system*, comprising
* Supplier such as Flexicon (e‐mail: info@icp‐solutions.de)
Screwed cable gland*
Flexible cable protection tubing*
O‐ring (provided by customer)
Unscrew the M12 sleeve and replace
with an M12 threaded tube coupling
Fig. 5.2
Cable protection (implemented by the customer)
5.6
EMC protection
Important
Load cells with shielded, round cables are EMC‐tested in accordance with EC
directives and are identified by CE certification. However, you must connect
the shield of the connection cable on the shielding electronics enclosure, in
order to achieve EMC protection for the measuring chain.
Electrical and magnetic fields often induce interference voltages in the measur
ing circuit. Therefore:
S
Use shielded, low‐capacitance measurement cables only (HBM cables fulfill
both conditions).
S
Do not route the measurement cables parallel to power lines and control
circuits. If this is not possible, protect the measurement cable with e.g.
steel conduit.
Summary of Contents for PW29 Series
Page 1: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Français PW29 ...
Page 3: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Français PW29 ...
Page 19: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Français PW29 ...
Page 37: ...Mounting Instructions Montageanleitung Notice de montage English Deutsch Français PW29 ...
Page 55: ...Dimensions PW29 A03313_02_Y00_00 HBM public 19 ...