
7
Z7A
LOAD INTRODUCTION
4
LOAD INTRODUCTION
Loads should be introduced as closely as possible in the direction of measurement. Tor
sional moments, off‐center loads and transverse or lateral forces cause measurement
errors and may damage the load cell. These adverse influences must be avoided, e.g. by
using stay rods or guide rolls. These elements must not absorb any load or force compo
nents in the direction of measurement.
HBM offers different load‐introduction components suiting various mounting situations in
order to minimize the adverse effects due to load introduction:
S
ZEL Rubber‐metal bearing
S
ZPL Pendulum bearing
S
EPO3R Thrust piece
S
ZL Load button insert
S
ZK Spherical cap
Summary of Contents for Z7A
Page 1: ...Z7A ENGLISH DEUTSCH FRAN AIS Mounting Instructions Montageanleitung Notice de montage...
Page 3: ...Z7A ENGLISH DEUTSCH FRAN AIS Mounting Instructions...
Page 18: ...Z7A ACCESSORIES 16...
Page 19: ...Z7A ENGLISH DEUTSCH FRAN AIS Montageanleitung...
Page 34: ...Z7A ZUBEH R 16...
Page 35: ...Z7A ENGLISH DEUTSCH FRAN AIS Notice de montage...
Page 51: ...17 Z7A ACCESSOIRES...
Page 52: ...HBK Hottinger Br el Kjaer www hbkworld com info hbkworld com A01847 02 Y00 01 7 0101 0019...