HB-TP180/200
Checking Facility for Temperature Control Units
Installation
30
O8354-EN 2018-11
6.2 Installation work
Before checking the temperature control unit, prepare the
temperature control unit as follows:
Connect cooling water inlet and
outlet
NOTE!
In order to optimally utilize the cooling capacity of
the temperature control unit, keep the cooling water
outlet as short and free of back-pressure as
possible.
1.
Connect cooling water inlet and outlet to cooling water
system.
2.
Remove any hoses, couplings and fittings at the main and
return line.
3.
Connect the HB-TP180/200 checking facility to the
temperature control unit using the central lock.
Connect system water inlet and
outlet
4.
Optionally connect system water inlet and outlet to system
water system.
Make electrical connections
5.
Electrical connections should be made by a certified
electrician under the following conditions:
Only make the electrical connections after the hydraulic
connections have been made.
Ensure that mains voltage and frequency corresponding to the
specification on the nameplate and in the technical data are
observed.
Select fusing of the temperature control unit according to the
information in the electrical circuit diagram (
Instruction
Manual Thermo-5).
6.
Only for units with additional equipment ZE:
Set the
Switch over external sensor
parameter in the
Settings \
Miscellaneous
menu item to “manual”
Connect the “External sensor” line to the temperature control
unit
ZE
.
NOTICE!
Note all actual values of parameters that you
change during the test.
Optionally, you can save the parameters to a USB
data carrier.
(
Thermo-5 Operating Instructions Chapter
“Save/Load”).