- Pre-operation inspection
HA12CJ - HA32CJ - -
3 - Inspection and Functional test
3.1 - D
AILY
INSPECTION
Each day before the beginning of a new work session and with each change of operator, the machine
must be subjected to a visual inspection and a complete functional test.
In case of loose fasteners, refer to torque table value in maintenance book.
In case of leaks, replace the damaged part before use.
In case of structural part deformation (cracks, broken weld, paint chips) replace the part before use.
S a m p l e o f b r o k e n w e l d s
We recommend these forms to be completed daily and stored to assist with your maintenance
schedule.
Each action is depicted in the daily inspection sheet using the following symbols.
Use the detailed program below.
• Never use a defective or a malfunctioning aerial work platform.
• If any item on the check list is marked "No" during the inspection; machine must be tagged and placed
out of service.
• Do not operate the machine until all identified items are corrected and it has been declared safe for
operation.
Oil change
Lubrication-Lubrication
Tightening
Levelling
Systematic replacement
Functional adjustments /
Checks / Cleaning
Visual inspection
To check by test
Summary of Contents for HA12CJ
Page 2: ...2 4000827180 E 09 18 USA GB HA12CJ HA32CJ HA12CJ HA32CJ ...
Page 84: ...84 4000827180 E 09 18 USA GB D Operation instructions HA12CJ HA32CJ HA12CJ HA32CJ Notes ...
Page 94: ...94 4000827180 E 09 18 USA GB E General Specifications HA12CJ HA32CJ HA12CJ HA32CJ Notes ...
Page 106: ...106 4000827180 E 09 18 USA GB G Other information HA12CJ HA32CJ HA12CJ HA32CJ Notes ...