92
4000328850
E 12 14
USA / GB
D
- Operation instructions
HA32PX - HA100JRT - HA41PX-NT - HA130JRT-NT
8.3 - U
NLOADING
Before unloading, check that the machine is in good condition.
• Remove the turntable rotation locking pin.
• Remove the tie downs.
• Select low drive speed at the platform control box.
• Start the machine.
To reinstate the system, lift the jib a few centimetres (inches) using the ground control box.
8.4 - T
OWING
In the event of a machine breakdown, the machine can be towed a short distance to load it
onto a transport vehicle :
• Ensure that no one is in the platform during towing.
• Ensure boom is in the stowed position and the turntable is locked, prior to towing.
• The platform must be empty.
To tow a broken-down machine, disconnect the wheel drive hubs.
Perform this operation on flat ground with wheels chocked.
In the towing configuration, the machine braking system is inactive. Use a drawbar to avoid
any risk of accident :
• Do not exceed the maximum speed machine unfolded (Refer to
Section B 4 Technical
specifications).
• Do not exceed a grade of 25%.
8.4.1 - Disengaging the drive hubs
Warning : Upon starting a machine that has been secured and transported, the safety system may detect
a false overload preventing all movement from the platform control box.
1.
Loosen and remove the 2 fastening
screws ( 1 ).
2.
Remove the clutch stop ( 2 ).
3.
Turn the clutch stop so that its domed part is
towards the interior of the wheel gears.
4.
Attach the clutch stop.
When drive hubs are disengaged, the machine is in free wheel mode and the brake system no longer
functions.
1
2
Summary of Contents for HA100JRT
Page 2: ...2 4000328850 E 12 14 USA GB HA32PX HA100JRT HA41PX NT HA130JRT NT...
Page 8: ...8 4000328850 E 12 14 USA GB HA32PX HA100JRT HA41PX NT HA130JRT NT A Foreword Notes...
Page 22: ...22 4000328850 E 12 14 USA GB HA32PX HA100JRT HA41PX NT HA130JRT NT A Foreword Notes...
Page 118: ...118 4000328850 E 12 14 USA GB F Maintenance HA32PX HA100JRT HA41PX NT HA130JRT NT Notes...