Attach rod end of
spring to lower bracket
Temporarily attach
angle bracket to the
center of the wood
block with two 5/8”
screws provided
Pre-drill several holes - temporarily install
Lower Bracket with 5/8” screws at
top rail
of bed
Lower Mounting Bracket
Position lower bracket on
top rail
Additional wood blocking may be
required
Bedlift
Instructions
Variable speed drill
Measuring Tape & Pencil
#2 Phillips screwdriver
Required for Installation:
1
24”
26”
back
30”
back
22”
24”
36”
22”
24”
3”
onnect the spring to the
upper bracket assembly on
both sides of the bed
*Pre-drill
holes
Install the wood blocks at the
locations with 1¼” gold
screws provided. Do not glue blocks