
5
Installation of Plumbing
To most effectively mark the wet spots in any bale, Harvest Tec recommends that the nozzles are
mounted directly above or below the Star Wheels. To get the best spray pattern focused directly on
the wet spot of the bale the nozzles will need to be approximately
1” above the bale that is being
marked. A small notch may need to be cut to increase surface area of the bale being marked.
1. Once you have the tank and mounting bracket securely fastened to the baler, locate parts A, B,
C, D & E pictured below in Figure 2. Assemble in the following order: (
A
) Elbow | (
B
) nozzle
holder | (
C
) check valve | (
D
) reducing bushing | (
E
) tip as pictured below.
*****Note: All parts should be thread taped*****
2.
Once the nozzle holders are fastened to the balers, route the 3/
8” hose to the tips. Make sure to
fasten the hose securely but avoid pinching the lines.
(Plumbing Diagram pictured in Figure 3)
*****Keep from routing the hose in the way of moving parts on the baler*****
3. Attach drain hose top hose barb fitting at bottom of tank. Run hose to a secure point and attach
valve assembly.
J
Check Valve
004-1207V
A
Elbow
003-SE14F
C
Brass Tip
004-TX-5
F
Straight Fitting
003-A1418
G
Quick Connect
004-1207H
H
Rubber Gasket
004-1207W
I
Tip Screen
004-1203-100
E
Nozzle Holder
001-4216
B
Nozzle Body
004-4722
D
Nozzle Cap
004-4723
Figure 2