background image

6

5 of 13

Select Installation Position

Pre-Assemble These Parts

Mark the bed frame 36” from the head of the bed

INSTALLATION TIP:

Make sure that the snap buttons in

part H are in the respective holes.

INSTALLATION TIP:

Put the Post in place now

Note:  Two connector tubes (H) replace AR18

36"

2

All moving parts must be pre-fastened

snugly and easily adjusted by hand.

C

Summary of Contents for AR250

Page 1: ...AR250 Arcorail Installation Instructions Schematics ...

Page 2: ...nt or to prevent people from falling out of bed There are correctly designed Bed Rails for these purposes ENTRAPMENT Entrapment describes a situation where a person s neck head chest or torso can get trapped in the space between the mattress and horizontal bar or between the vertical bar and the side of the mattress The mattress must be tight against the vertical bar and should be checked daily A ...

Page 3: ...oRail to the most comfortable position for you and grab it to assist you when you are moving 4 Maintenance Regular maintenance and cleaning will improve the safety and durability of your ArcoRail Periodically make sure that all the bolts are tight Always make sure that the mattress is tight against the vertical post 2 of 13 REPLACE THIS WITH NEW WORDING To rotate the horizontal bar to another posi...

Page 4: ... ASSEMBLY D 1 FRONT ANCHOR TUBE ASSEMBLY E 1 LONG POST F 1 MEDIUM POST G 1 SHORT POST H 2 EXTENSION TUBE I 1 HEIGHT ADJUSTING PIN J 1 POST CAP L 3 16 ALLEN KEY N LARGE HOME STYLE CLAMP O SMALL HOME STYLE CLAMP NOTE ITEMS N AND O ARE PRE INSTALLED 1 1 1 M 1 5 32 ALLEN KEY Measure and record the total thickness of the mattress and mattress base box spring If necessary move the bed away from the wall...

Page 5: ...ed frame width 34 40 54 60 DOUBLE OR QUEEN 72 76 KING OR CALIFORNIA KING D C H H C C 1 TWIN OR SINGLE 4 of 13 Pick Post Length Handle Configuration Pick Frame Width LONG POST E WITH HANDLE ATTACHMENT MATTRESS MATTRESS BASE BOX SPRING 18 to 24 LONG POST E 13 to 18 9 to 13 MATTRESS MEDIUM POST F SHORT POST G MATTRESS MATTRESS BASE BOX SPRING MATTRESS MATTRESS BASE BOX SPRING G F E E 6 to 9 REMOVED B...

Page 6: ...ame 36 from the head of the bed INSTALLATION TIP Make sure that the snap buttons in part H are in the respective holes INSTALLATION TIP Put the Post in place now Note Two connector tubes H replace AR18 36 2 All moving parts must be pre fastened snugly and easily adjusted by hand C ...

Page 7: ...e to Frame 1 2 3 Put the ANCHOR ASSEMBLY under the bed frame 36 from the head of the bed Hook anchor handle into bed frame rail as shown Take opposite end and hook it onto the bed frame Proceed to tightening bolts in step 4 36 onto ...

Page 8: ... locking positions A Insert the height adjusting screw into the post and tighten securely I ball pin 7 of 13 Tightening Arcorail Base to Frame Ensure all parts are attached firmly to simulate one solid part and install in numeric order as shown 5 6 7 4 2 4 5 3 Secure but do not over tighten this bolt Tighten the front bolt Tighten the bolt Tighten the bolt Secure but do not over tighten this bolt ...

Page 9: ...t allow a gap greater than 3 inches 75mm see below for important details and check to ensure all bolts and parts are firmly fastened before placing mattresses onto the bed frame and periodically tighten as required I E F G A the appropriate selected POST IMPORTANT ...

Page 10: ...10 We don t bite so contact us info hartmobility com www hartmobility com 1 800 998 0774 ...

Reviews: