50
Control Panels for X75 Systems Installation and Operation Manual
Chapter 2: Operation via Front Panel Controls
RP219-2
RP219-2
RP219-3
RP219-3
RP219-4
RP219-4
Table 2-10.
SDTV Test Signals
SD-SDI 525
SD-SDI 625
SMPTE Bars
Bars 100%
EIA Bars
Black
Full Field Bars
Gray
Bars/Reverse
White
Bars/Red
Luma Ramp
Bars 100%
Modulated Ramp
Black
Luma 5-Step
Gray
Modulated 5-Step
White
Shallow Ramp
Luma Ramp
Luma Sweep 5.5MHz
Modulated Ramp
Chroma Sweep
Luma 5-Step
VIRS
Modulated 5-Step
Cross Hatch
Shallow Ramp
Pluge
Multiburst-60IRE
SIN(X)/X
Luma Sweep 5.5MHz
Timing Bowtie
Chroma Sweep
Matrix 1
Pulse and Bar
FF Bounce
NTC7 Composite
SDI EQ Test
NTC7 Combination
SDI PLL Test
FCC Composite
Zone Plate
Table 2-9.
HDTV Test Signals
HD-SDI 1080
HD-SDI 720
Summary of Contents for assuredcommunications X75-RCP
Page 1: ...Edition F 175 000248 00 Control Panels for X75 Systems Installation and Operation Manual...
Page 2: ......
Page 3: ...Edition F December 2007 Control Panels for X75 Systems Installation and Operation Manual...
Page 8: ...vi Control Panels for X75 Systems Installation and Operation Manual Contents Index Keywords 71...
Page 98: ......