background image

7. Nameplate

  Each control box includes a nameplate with the following information.
 
  • Part Number and Gas Service
  • Model Number
  • Pressure Ratings
  • Connections
  • Relief Valve Rating
  • Manufacturing Date Code 
  • Any Electrical requirements
 

 

8. Installation Instructions

  NOTE: A detailed video of a typical installation can be viewed at   -  

http://bit.ly/S4BUgV

  

  

 

 

 

 

 

 

#9005749 Adapter for Single Cylinders on each side 

#9005708 Adapter for Manifold Headers on each side

 

Figure 1 

Figure 2

1.  The control box should be attached to a wall or other secure structure such that the inlet connections to the box are approximately 60 inches from the floor.  This dimension can be 

slightly higher or lower depending on the cylinder height.  The mounting dimensions for the control box are shown in Figure 3.  Horizontal mounting studs should be dimensioned at 16” 
and vertical mounting studs dimensioned at 9.25”.  The box does not come with mounting hardware as the customer should choose fasteners appropriate for the mounting surface.

 

 

 

Figure 3

2.  Once the fasteners are properly attached to the wall or mounting surface, place the control box onto the fasteners.  Tighten the fasteners once the box is in place.  Make sure the box 

is level as this is necessary to align the header bars.

3.  Attach the outlet of the control box to the central piping system.  Common 1”-11 NPS manifold fittings are supplied with this system.  Other connections may be used.  The outlet port 

connection on the control box is ½” FNPT.  Note: Acetylene systems are supplied with a pipeline protection device required by NFPA.  It is intended that this device be installed directly 
on the outlet connection of the control box, however, this device can be installed further downstream, if desired.  It must be installed between the manifold box and the first point of 
use for the acetylene gas.

4.  It is recommended that a shut off valve be installed on the central piping system immediately downstream of the control box.  This will insure that gas supply from the manifold system 

can be shut off quickly in an emergency situation.

5.  If the system only has one cylinder on each side with no right and left header bar, then assemble the cylinders and hoses to the manifold box as shown in Figure 4.  As a safety 

precaution, cylinders must be secured in place with approved cylinder mounting brackets according to OSHA, state and/or local codes to prevent accidental tipping.  Wrench tighten 
all connections.   If the system is configured for multiple cylinders per side, then proceed to step 6.  Otherwise, refer to the Operation Instructions section.

The Series 220 Manifolds can be used either with two cylinders (one on each side) or with multiple cylinders on each 
side.  For single cylinders on each side, connect the hoses to the manifold box using the adaptors provided (See Fig. 
1).  For multiple cylinders on each side, attach the header to the manifold box using the manifold header adaptor 
provided (see Fig. 2).

THE HARRIS PRODUCTS GROUP

www.harrisproductsgroup.com

1.800.241.0804

Summary of Contents for 220 Series

Page 1: ...lable in close proximity 7 Many gases can cause asphyxiation by displacing oxygen in the atmosphere Make certain the area where these manifolds are operated is well ventilated 8 Do not release asphyxi...

Page 2: ...snow The manifold should be located in a clean well ventilated area which is free of oil and combustible materials Leave all protective covers in place until their removal is required for installatio...

Page 3: ...may be used The outlet port connection on the control box is FNPT Note Acetylene systems are supplied with a pipeline protection device required by NFPA It is intended that this device be installed di...

Page 4: ...off valves 4 Turn the selector knob on the control box to the primary side right or left 5 S L O W L Y open the first cylinder valve on the primary side Warning It is important that all cylinder valve...

Page 5: ...ary Preset Outlet Inlet Delivery Pressure Green Red Heater Power Number Box P N Regulator Regulator Regulator Gauge Gauge Switch Light Light Assembly Supply 220 Oxy Inlet 4301529 3001570 3001602 30016...

Page 6: ...de seguridad que deben tenerse en cuenta cuando se manejan gases comprimidos Si no est seguro de comprender por completo las precauciones de seguridad para manejar gases comprimidos comun quese con H...

Page 7: ...nsiste de un cubo de control caja y dos cabezales o mangueras de banco de suministro uno principal y otro de reserva a fines de proporcionar un suministro ininterrumpido de gas para la aplicaci n espe...

Page 8: ...ualquier requisito el ctrico 8 Instrucciones de instalaci n NOTA Puede ver un video detallado sobre una t pica instalaci n en http bit ly S4BUgV Los colectores de la serie 220 pueden utilizarse con do...

Page 9: ...control Esto garantizar que el suministro de gas del sistema del colector pueda cerrarse r pidamente en una situaci n de emergencia 5 Si el sistema solo tiene un cilindro en cada lado sin una barra d...

Page 10: ...Allen 5 32 in Gire el tornillo de ajuste hacia la derecha hasta que se lea la presi n deseada en el man metro de presi n de suministro Puede tomar algunos segundos para que la presi n se iguale en la...

Page 11: ...electricidad o el suministro el ctrico es defectuoso Verifique la entrada de voltaje en el suministro el ctrico debe ser de 115 VCA Verifique la salida de voltaje del suministro el ctrico debe ser de...

Page 12: ...lles et de collecteurs de m me que le robinet principal doivent toujours tre ouverts tr s l e n t e m e n t La chaleur due la recompression risque d enflammer les mat riaux combustibles 13 Les flexibl...

Page 13: ...psi 220 Gaz de p trole liqu fi s GPL 0 100 psi Plage de pression de sortie 220 220HL Haute pression 5 125 psi 220HP 200 psi 220 Ac tyl ne 0 15 psi 220 Gaz de p trole liqu fi s GPL 0 30 psi Pression de...

Page 14: ...positif est pr vu pour tre install directement sur le raccord de sortie du boitier de contr le Toutefois il peut tre install plus en aval si n cessaire Il doit tre install entre le boitier du collecte...

Page 15: ...uvrez L E N T E M E N T le robinet d arr t principal du c t de la source principale et v rifiez la pr sence de fuites au niveau du raccord entre la barre de collecteur et le boitier de contr le l aide...

Page 16: ...niveau de la tuyauterie en aval V rifiez qu aucun raccord ou joint ne pr sente de fuites resserrez r parez ou remplacez les tuyaux ou les raccords Fuite au niveau du robinet de la bouteille V rifiez q...

Reviews: