13
Installation and setting up
Installation and setting up
DANGER! DO NOT operate the machine until you have read and observed all the
precautions listed under “Safety information” on page 5.
Location
The JEM ZR series machines are designed to be located on the floor or may be
suspended using the hanging bracket. The machine can operate in any
orientation from 45° upwards to 45° downwards. Steeper tilting may cause fluid
leakage.
If the machine is to be suspended, ensure the mounting surface can support the
weight of the machine. Do not suspend the machine over areas where people
will be underneath. Use only the hanging bracket to suspend the machine.
Ensure that there is at least 100 mm (4 in.) clearance all-round the machine and
at least 600 mm (24 in.) in front of the fog output.
The machine is delivered with white nylon shipping bolts fitted to the
hanging bracket in place of the normal hand-wheel bolts. Before first
use, remove the shipping bolts and replace them with the hand-wheel
bolts (outside of bracket) and spacers (inside of bracket) which are
supplied separately in the packaging.
AC power
Before using the machine, ensure that a grounding-type (earthed) power plug
that fits the local power receptacle is installed on the power cable provided.
DANGER! Make sure the power plug is correctly rated:
•
For EU ZR25, ZR35, ZR45 models use a plug rated at 10 A minimum.
•
For US ZR25 use a plug rated at 10 A minimum.
•
For US ZR35 use a plug rated at 15 A minimum.
•
For US ZR45 use a plug rated at 20 A minimum.
When installing the plug, follow the plug manufacturer’s instructions and
connect pins as follows:
Yellow and green wire to ground (earth), blue wire to neutral and brown wire to
live.
The table below shows some common pin identification schemes.
wire
function
marking
screw colour
brown
live
“L”
yellow or brass
blue
neutral
“N”
silver
green/yellow
earth
green