PART #
DESCRIPTION
1.
CLC-BLOCK
LATCHTAP BLOCK
2. 41S-6
BRASS FLARE NUT(included in CPE-PO)
3. SC-1
STAINLESS TUBING(included in CPE-PO)
4. 68-6
BRASS 3/8”FIP X 3/8” COMPRESSION
5. N-6X1.5
3/8 X 1.5 PIPE(included in CPE-PO)
6. LTHS
LATCHTAP HEAT SHIELD
SWITCHING DEVICE FOR MATCHING KIT
LCK-RC (REMOTE CONTROL KIT)
A. RC-S6V-LT
REMOTE CONTROL
1. (4) AA Batteries
NOT PICTURED
2. A23 Battery
NOT PICTURED
LCK-BC (BARK CHIP KIT)
B. BPBCS
BARK CHIP SWITCH
1. 9v BATTERY
NOT PICTURED
LCK-WS (WALL SWITCH KIT)
C. WG-WS
WALL SWITCH
1. (4) AA Batteries
NOT PICTURED
LCK-WWS (WIRELESS WALL SWITCH KIT)
D. WS-S6V-LTST
WIRELESS WALL SWITCH
1. (4) AA Batteries
NOT PICTURED
2. CR2032
NOT PICTURED
INSTALLATION
1. Use the CPE-PO (Safety Pilot Valve Kit) Installation
Instruction to properly install the Extension Connector and
Pilot Assembly to the Ember Burner.
2. Attach the N-6X1.5 to the side port of the CLC-BLOCK.
3. Attach the other end of the N-6X1.5 to the outlet side of
the CPC-C
4. SC-1 assembly
– Slide the 41S-6 onto the SC-1with both
flared ends going the same direction. Attach the 68-6
compression fitting to the SC-1 by sliding the nut and then
the ferule from the 68-6 onto the SC-1 then threading and
tightening the compression end of the 68-6 to the nut.
5. Attach the 68-6 end of the SC-1 assembly to the back port
of the CLC-BLOCK.
6. Verify that the brass elbow 49-6-6 is attached to the
ember burner and the flared end is facing forward. Attach
and tighten the 41S-6 end of the SC-1 to the 49-6-6.
7. Attach the wires on the CLC-BLOCK to the Switching
Device included in the LCK kit.
8. Assure the switching device is located as close to the
front opening of the fireplace and as far away from the
Ember Burner pan as possible.
9. Follow the Lighting Instructions in the CPE-PO Installation
instruction for proper lighting procedures.
HARGROVE GAS LOG
LATCHTAP KIT (LCK-RC, LCK-BC,
LCK-WS, LCK-WWS)
INSTALLATION INSTRUCTION
B
A
C
NOTE: This kit is used to upgrade a Manual Safety Pilot Kit (CPE-PO) to function using a
switching device (remote control, bark chip switch, or wall switch). Follow the Installation
Instructions in the CPE-PO kit for proper installation and operation.
USE THE PARTS LISTED BELOW WITH PARTS IN THE CPE-PO PILOT KIT
PARTS INCLUDED IN
SAFETY PILOT KIT
LTHS
CLC-BLOCK
HEAT SHIELD INSTALLATION
1
3
2
4
5
6
LATCHTAP KIT
INSTALLED
CLC-BLOCK
N-6X1.5
CPC-C
SAFETY
PILOT
VALVE
(included
in CPE-PO
EMBER
BURNER
PILOT
ASSEMBLY
41S-6
SC-1
68-6
49-6-6
IMPORTANT: GAS WILL NOT FLOW TO THE
EMBER BURNER UNTIL THE LATCHTAP (CLC-
BLOCK) IS ENGAGED USING ONE OF THE
SWITCHING DEVICES.
D
f i r e - p a r t s . c o m