
DRIVE BELT REPLACEMENT
1. Remove the spindle drive motor as described on page 4-1.
2. Remove three screws “F”, Figure 4.3. Insert them into the adjacent tapped holes and withdraw
bearing housing “G”.
3. Remove the two screws and bushings “H”.
4. Remove four screws “I” and one screw “J”.
5. Remove the four screws securing speed changer “K”.
6. Remove top housing “L”. Tap to clear the dowels.
7. Replace the belt.
4-2
M-477A
Figure 4.3 - Drive Belt Replacement
TP5322
F
G
I
K
L
J
H
Summary of Contents for Bridgeport EZ Vision
Page 10: ... NOTES viii M 477A ...
Page 18: ...HEAD DIMENSIONS 1 8 M 477A Figure 1 5 Head Dimensions TP5663 ...
Page 20: ... NOTES 1 10 M 477A ...
Page 36: ... NOTES 2 16 M 477A ...
Page 44: ... NOTES 3 8 M 477A ...
Page 58: ... NOTES 4 14 M 477A ...
Page 64: ... NOTES 5 6 M 477A ...
Page 70: ... NOTES 6 6 M 477A ...
Page 71: ...CHAPTER 7 PARTS LISTINGS HEAD TOP HOUSING M 477A 7 1 TP5340 ...
Page 74: ...HEAD BACK GEAR 7 4 M 477A TP5341 ...
Page 78: ...HEAD LOWER HOUSING 7 8 M 477A TP5343 ...
Page 84: ...BASIC MACHINE 7 14 M 477A TP5344 ...
Page 96: ...OPERATOR PENDANT DC150 Motion Control System 7 26 M 477A TI5563 ...
Page 97: ...POWER CASE EXTERNAL VIEW DC150 Motion Control System M 477A 7 27 TI5564 ...
Page 103: ... NOTES M 477A 7 33 ...
Page 104: ......