
3 - Description
21
Diagram - EVC Liquid system with optional extras
1.
Agitation valve
2.
Pressure valve
3.
Suction valve
4.
Pump
5.
Main tank
6.
Suction filter
7.
Safety valve
8.
Pressure regulation
9.
Flowmeter
10.
Pressure gauge
11.
Distribution valves
12.
Return pressure drop
13.
Return to tank from pressure equalization
14.
Distribution boom
15.
Self-Cleaning filter
16.
Return valve
17.
Suction filling device valve
18.
TurboFiller
19.
TurboFiller valve panel
20.
TurboFiller ejector
21.
Rinsing nozzle
22.
Suction filling device coupler
23.
Rinsing tank
24.
One-way valve
Summary of Contents for MASTER PRO VHH
Page 6: ...Table of Contents 6 ...
Page 8: ...1 EC Declaration 8 ...
Page 12: ...2 Safety notes 12 ...
Page 50: ...5 Operation 50 ...
Page 52: ...6 Maintenance 52 Boom lubrication oiling plan Lift lubrication oiling plan ...
Page 70: ...7 Fault finding 70 ...
Page 76: ...8 Technical specifications 76 Charts Boom hydraulic Z ...
Page 78: ...8 Technical specifications 78 ...
Page 82: ...HARDI INTERNATIONAL A S Helgeshøj Allé 38 DK 2630 Taastrup DENMARK ...