Page 4
For technical questions, please call 1-888-866-5797.
Floor Jack
Operating Instructions
Read the ENTIRE IMPORTANT SAFETY INFORMATION section at the beginning of this
manual including all text under subheadings therein before set up or use of this product.
Tool Set Up
Attaching the Handle
CAUTION! The Handle socket may be held
down by a clip under tension. Wear ANSI-
approved safety goggles before freeing
handle socket. Remove clip carefully.
1. Fasten the Upper Handle to the Lower Handle.
2. Loosen the Set Screw and insert the
assembled Handle into the Handle Socket.
3. Tighten the Set Screw.
Bleeding
1. Loosen the Fill Screw.
2. Insert the Handle into the Handle Socket
to operate the Release Valve.
3. Turn the Handle counterclockwise to open the valve.
4. Pump the Handle up and down quickly several
times to purge air from the system.
5. Tighten the Fill Screw.
Adding Oil
1. Remove the Fill Screw.
2. Add high grade hydraulic fluid into the Fill Screw
slowly until the oil reaches the top of the oil fill hole.
Note:
Do not touch the Handle when
adding the hydraulic oil.
3. Replace the Fill Screw.
SAFETY
OPERA
TION
MAINTENANCE
SETUP