![HandTop HT2500UV Operation Manual Download Page 37](http://html1.mh-extra.com/html/handtop/ht2500uv/ht2500uv_operation-manual_3553561037.webp)
37
Finish installing the printheads one by one
See Appendix
5. Channel information of yocera head
for connection of printhead cables
4.9 Filling ink
The ink filling operation can only be executed when the ink lines and the connections
of the cables are carefully double-checked after the printhead installation.
Shutdown the spray function of the program and adjust the value to -1.5kPa, avoid the
automatic protection of system when the negative pressure fluctuates in the ink filling
operation process.
Verify that all cables of the ink pumps are connected properly and then fill in each
main tank with the color of ink accordingly.
The ink pumping function will be interrupted if the Sub Tank is still not filled to its
standard ink amount every 15s, and the buzzer will make a three-alert. Normally this
alert can be ignored by resetting of the ink filling function, and the ink filling can be
accomplished by the repeating the operation a couple of times.
When finishes the ink filling, adjust the pressure to a value of -3.8kPa, then turn on the
valves of the Sub Tank.
4.10 Air exhausting of the printhead
The exhausting operation should be done the first time of printhead installation
This operation can help exhaust the air bubbles in the chamber.
This operation can also be used to deal with the nozzles missing problem.
Summary of Contents for HT2500UV
Page 1: ...1 HT2500UV Handtop Large Format UV Printer Operation Manual Original Instructions...
Page 17: ...17 5 6 Labels and logo on printer 1 11 2...
Page 18: ...18 3 4 7 5 10 6 9 8...
Page 19: ...19...
Page 20: ...20 1 2 3 4...
Page 26: ...26 Select OS version x64 for 64 bit windows Select the communication port...
Page 27: ...27 Select the printer model Select DPI...
Page 28: ...28 Select rows...
Page 30: ...30 Select additional task Confirm and install Wait for installation...
Page 31: ...31 Install the initiations Click finish to continue...
Page 32: ...32 Install the driver for PCIE card Accept...
Page 33: ...33 Continue Finish Normally we do not have to reboot computer after installation...
Page 36: ...36 Finish the connecting between sub tank to heads and fix the printhead...
Page 45: ...45 Reset the value of the zero position in the layout option...
Page 64: ...64 2 Certifications...
Page 66: ...66 4 Rating plate...
Page 68: ...68 ii CMYKLcLmWW...
Page 69: ...69 iii CMYKVW iv CMYkWW...
Page 70: ...70 v CMYKVVWW vi CMYKLcLm...
Page 71: ...71...