![Hampshire Controls MPS Operating Instructions Manual Download Page 19](http://html.mh-extra.com/html/hampshire-controls/mps/mps_operating-instructions-manual_587706019.webp)
Hampshire Controls Corporation
20 Mar. 2021
MPS Operating Manual
Page 18
Testing Email Transmission
On the main MPS web page (http://[IP address of MPS]) click the “Send test email (to all)”
hyperlink and wait (up to 2 minutes, depending if the SMTP connection is successful or times
out).
Now click the "View Test/Email/Time Log" hyperlink. At the end of the log you should see the
result of the test.
Failing log entry:
02/11/2021 09:44
User Email Test 1fail
Passing log entry:
02/11/2021 09:50
User Email Test 1sent
If the result is
1sent
, you may check your email for the received message.