36
! " §
$
%
&
Saw-Spindle Moulder
B3 / B3 e-classic
Warning! Risk of injury! Vacuum hose must be flame-resistant and must conduct electricity! Be sure to use only
genuine Hammer vacuum hoses!
• In addition, the vacuum performance must be sufficient
to achieve the required negative pressures and an air
speed of 20 m/s at the connector. (see “Technical
data”)
• Check the air speed before putting the machine into
operation for the first time and after essential changes.
• The dust extractor setup must be controlled before the
machine is put into operation for the first time. Check for
obvious defects on a daily basis and the efficiency on a
monthly basis.
Note: As a rule, all units must be vacuumed during use. A time delayed socket is available as an accessory.
• The dust extractor must be connected to the machine
in such a manner that it runs in unison with the
machine.
• The dust extraction hoses must be electrically conduc-
tive and grounded to prevent electrostatic
build up.
• Use dust extractors with reduced dust emission to clean
dust from the machine.
Setup and installation
7.4.4 Circular saw guard
Fig. 7-7: Circular saw guard
!
Splitter
"
Thumb nut
§
Hood stud
$
Circular saw guard
%
Recess for saw blades from 300 to 315 mm
&
Recess for saw blades from 250 mm
The saw guard is mounted onto the splitter. The mounting
depends on the diameter of the saw blade:
• Recess for saw blades from 300 to 315 mm
• Recess for saw blades from 250 mm
1.
Loosen the thumb nut.
2.
Push the hood stud to the back with the thumb nut.
3.
Circular saw guard Remove the saw guard and insert
it into the other recess.
4.
Tighten the thumb nut.
7.5 Chip extraction