
FLUE SENSOR
9.11
Refer to Figure 50
a)
Ensure supply voltage is isolated.
b)
Disconnect the electrical lead from the flue sensor.
c)
Unscrew the flue sensor and remove from the flue hood.
d)
Fit the replacement flue sensor and reconnect the electrical lead (blue
plug).
CONTROL PCB
9.13
Note:-
When replacing the control PCB it is important that the
instructions supplied with the new PCB are followed. Do not use any
old BCC cards.
The following is only a guide. Refer to Figures 22, 27 & 30
a)
Ensure supply voltage is isolated.
b)
Unclip the user interface from its housing (see figure 22).
c)
Lower the controls front.
d)
Unplug the electrical leads from the PCB. Refer to section 7.
e)
Remove the PCB plastic cover.
f)
Unclip the PCB and withdraw.
g)
Fit the new PCB and BCC if required.
h)
Re-assemble in reverse order.
i)
If the boiler requires resetting turn the CH Temperature Control
knob anti-clockwise to 'STANDBY' position and then back to 'ON'
within two seconds. Refer to section 5.4.
After fitting a new PCB always re-check the combustion of the boiler
to ensure it is within the values quoted in section 2.3.
If the combustion figures are not within the values quoted then
contact Halstead Glen Dimplex service helpline Tel: 0844 371 1111.
50
FLUE SENSOR
FLUE
SENSOR
CONDENSATE DRAIN SYSTEM
9.12
Refer to Figure 30
a)
Ensure supply voltage is isolated.
b)
Open the drain sump cap, while holding a receptacle beneath to
capture any condensate.
c)
Disconnect the condensate drainpipe from the appliance.
d)
Undo the two locknuts holding the system in place.
e)
Detach the condensate drainpipe sump adaptor, by gently pulling
down.
f)
Remove the condensate drain system, clean or replace as
necessary.
g)
Re-assemble in reverse order; ensure that all joints and seals are
correctly re-fitted.
36
SINGLE PAGES 20/9/10 10:01 Page 38