background image

97885C (REV. C - 5/04)

HCRFERQ - B

Halsey Taylor Owners Manual

Refrigerated Fountain with Back Panel

To assure you install this model easily and correctly,

PLEASE READ THESE SIMPLE INSTRUCTIONS BEFORE STARTING THE

INSTALLATION. CHECK YOUR INSTALLATION FOR COMPLIANCE WITH

PLUMBING, ELECTRICAL AND OTHER APPLICABLE CODES. After installation, leave

these instructions inside the fountain for future reference.

IMPORTANT! INSTALLER PLEASE NOTE.

THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE, COMPUTERS, ETC. TO

WATER LINES IS A COMMON PROCEDURE. THIS GROUNDING MAY BE IN THE BUILDING OR MAY

OCCUR AWAY FROM THE BUILDING. THIS GROUNDING CAN CAUSE ELECTRICAL FEEDBACK

INTO A FOUNTAIN, CREATING AN ELECTROLYSIS WHICH CAUSES A METALLIC TASTE OR AN

INCREASE IN THE METAL CONTENT OF THE WATER. THIS CONDITION IS AVOIDABLE BY USING

THE PROPER MATERIALS AS INDICATED. ANY DRAIN FITTINGS PROVIDED BY THE INSTALLER

SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING

PLUMBING SYSTEM.

IMPORTANT

ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON

FIG. 2

FIG. 1

HCRF - ER

Installer

NOTE: WATER FLOW

DIRECTION

BUILDING WATER INLET

SERVICE STOP

(NOT FURNISHED)

1/4" O.D. TUBE

WATER INLET

TO CHILLER

3/8" O.D. UNPLATED

COPPER TUBE CONNECT

COLD WATER SUPPLY

Reviews: