background image

 

SPOGG Sport-Güter GmbH • 35614 Aßlar/Berghausen • Germany 

[email protected]

 • www.hally-gally-spielplatzgeraete.de

 

 

 

 

T:\PLAY\Play Installation Instructions\Installation Instructions 2012-2013\20_01_080-01-en-007.doc 

- 1 - 

 

 

A

  Assembly Instructions 

 Bird’s Nest Carousel 

 Art-No. 20.01.080 

 

    

    

 

Summary of Contents for 20.01.080

Page 1: ...Germany spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 01 en 007 doc 1 A Assembly Instr...

Page 2: ...geraete de 2 T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 01 en 007 doc Revision history Revision 0 2004 02 24 First approved version Assembly instructions Revis...

Page 3: ...Delivery Contents parts list with part numbers 8 4 Erection Instructions 11 5 Post Installation Checks 18 B Maintenance Instructions 19 6 Introduction Maintenance 21 7 General Maintenance Information...

Page 4: ...pe up to 3 Any spare parts that may be required can be obtained directly from your supplier Please do not hesitate to call your supplier if you have any problems during installation or in case of any...

Page 5: ...lawn or similar material with solid or hard bordering No solid objects e g benches bollards dustbins fences etc are to be installed within the specified increased safety area 2 Required Safety Surface...

Page 6: ...ty interleave bound with minor portion of stone portion 30 with bigger diameter of 63 mm grain size Soil class 5 ground with soil class 3 and 4 with big portion of stones portion 30 with bigger diamet...

Page 7: ...e no mandatory technical views of the complete item We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable fo...

Page 8: ...90 m 3 1 Handwheel 450 mm 160 mm high 4 1 Post cover 345 mm 340 mm high 5 1 Cover 350 mm 140 mm high 100 8 Cylinder head bolts with hexagon sockets DIN 6912 A2 7 M10 x 25 mm 101 8 Internal tooth lock...

Page 9: ...ons Installation Instructions 2012 2013 20_01_080 01 en 007 doc 9 3 2 In Symbols Table 3 2 Delivery Contents in symbols Pos Quantity Symbol 1 1 193 mm 3 80 m long 2 1 1 90 m 3 1 450 mm x 160 mm 4 1 34...

Page 10: ...spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 10 T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 01 en 007 doc Pos Quantity Symbol 10...

Page 11: ...4 A lar Berghausen Germany spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 01 en 007 doc...

Page 12: ...y spielplatzgeraete de www hally gally spielplatzgeraete de 12 T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 01 en 007 doc Screw locking device Glue all screws nu...

Page 13: ...er GmbH 35614 A lar Berghausen Germany spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 0...

Page 14: ...er GmbH 35614 A lar Berghausen Germany spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 14 T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_08...

Page 15: ...er GmbH 35614 A lar Berghausen Germany spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 0...

Page 16: ...er GmbH 35614 A lar Berghausen Germany spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de 16 T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_08...

Page 17: ...gth ML Post height above playing level MS verm Protection for pole stainless steel pipe hast o be centered to the height of the black PE ring O K Upper edge of playing level PS G V lawful required saf...

Page 18: ...t has not been installed safely in the following cases Safe equipment installation is not complete The protective surface has not been installed yet Appropriate maintenance work cannot guarantee opera...

Page 19: ...rmany spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 01 en 007 doc 19 B Maintenance Ins...

Page 20: ...raete de 20 T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 01 en 007 doc Revision history Revision 0 2004 02 24 First approved version Maintenance instructions Rev...

Page 21: ...ted in accordance with EN 1176 7 guidelines Please note Providing any necessary repairs are carried out a piece of play equipment that is inspected regularly cannot become so damaged that it is danger...

Page 22: ...e of the characteristics of stainless steel is that uncontrolled cold welding may occur when the nuts are tightened To prevent this it is necessary to spray the nuts and bolts with Teflon spray or ano...

Page 23: ...ys cause quality problems and put safety at risk Therefore loose screws should always be tightened and checks carried out to ensure that there are no missing screws 7 11 Preventing equipment use The u...

Page 24: ...mises the safety and function of the equipment 8 1 2 Maintenance intervals in the event of intensive use Please note that more frequent inspections and or maintenance are required if the play equipmen...

Page 25: ...14 A lar Berghausen Germany spogg hally gally spielplatzgeraete de www hally gally spielplatzgeraete de T PLAY Play Installation Instructions Installation Instructions 2012 2013 20_01_080 01 en 007 do...

Page 26: ...for wear and tear or damage and replace if necessary 10 7 If necessary remove excess padding material from the post footings due to danger of rotting 10 8 Check the surface of wooden parts for damage...

Page 27: ...quipment foundations and surfaces are safe for operation 12 2 In particular the equipment should be checked for decay and corrosion It may be necessary to dig out or excavate certain components in ord...

Page 28: ...8 13 Maintenance Printout Name of Item Bird s Nest Carousel ______________ Art No 20 01 080 ____________________________________ Location ______________________________________________________________...

Page 29: ..._________________________________________________________ ______________________________________________________________ Competent Person in Charge ____________________________________________________...

Reviews: