background image

10 / 19 

 

HakkiFeed 422 rev. A 

Translated 

Version 1-2019 

 

9.

 

Assembly instructions and spare parts diagrams 

9.1.

 

Parts list for the assembly 

 

No. 

Part 

number 

Name 

Standard  Dimensions  Pcs 

31206 

End, cylinder side 

  

  

50037432 

Rear end 

  

  

96044 

Retaining ring 

DIN 471 

30 

31230 

Extension 

  

  

96208 

Hitch pin 

  

  

48033 

Pin 

  

Ø16 L=135 

48015 

Height adjustment pipe 

  

  

95003 

Keel roller 300 

  

  

31059 

Log rotator 

  

  

10 

11160 

Cylinder HF422 

  

  

11 

97307 

Hydraulic motor HF422 

  

  

12 

95057 

Collar step bearing unit 

  

UCFL 205 

13 

61105 

Drive roller 

  

  

14 

50037451 

Middle pipe 

  

  

15 

50037464 

Intermediate support 

  

  

16 

50033060 

Lock valve HF422 

  

  

17 

50037476 

Vertical support 

  

  

18 

96058 

Washer  

DIN 125 

A12 

44 

19 

96059 

Washer  

DIN 125 

A16 

20 

96054 

Washer  

DIN 125 

A24 

21 

96218 

Locking nut  

DIN 985 

M12 

24 

22 

96219 

Locking nut  

DIN 985 

M16 

23 

96376 

Hex screw 

DIN 931  

M12x80 

24 

96118 

Hex screw 

DIN 931  

M16x90 

25 

96332 

Hex screw 

DIN 931  

M12x130 

26 

96111 

Hex screw 

DIN 931  

M12x90 

27 

96149 

Hex screw 

DIN 933  

M12x45 

28 

96148 

Hex screw 

DIN 933  

M12x40 

29 

96247 

Split pin 

DIN 94 

3.2x40 

30 

50037504 

Diagonal support 

  

  

31 

97213 

USIT 1/2" 

  

  

32 

97203 

Double nipple 3/8" x 1/2" 

  

  

33 

97151 

Hydraulic hose 3,800 x 3/8” + 

quick co guard 

  

  

34 

97152 

Hydraulic hose 4,500 x 3/8” + 

quick co guard 

  

  

35 

97060 

Hydraulic hose 1,200 x 3/8" 

  

  

 

Summary of Contents for HakkiFeed 422

Page 1: ...d maintenance manual Spare parts manual EC Declaration of Conformity Safety instructions Guarantee terms MAASEL N KONE OY Valimotie 1 FI 85800 Haapaj rvi Tel 358 0 8 772 7300 info hakkipilke fi www ha...

Page 2: ...hine 5 3 1st Arranging the machine for operation and transport 5 3 1 1 Adjustments 5 3 1 2 Connecting the hydraulics 6 4 Operating the machine 6 4 1st Performing a test run on the machine 6 4 2nd Load...

Page 3: ...aced on the rack is 4 metres and the minimum length is 2 metres Machine models and basic information Model HakkiFeed 422 accessory Hakki Pilke Driving power Hakki Pilke firewood processor s hydraulics...

Page 4: ...2 1 Delivery inspection Dispose of the packaging material in an environmentally friendly manner Check that the machine has not sustained any damage during transit and ensure that all necessary parts a...

Page 5: ...ration ensure that it is positioned on an even and firm foundation so that the logs on the rack are straight Ensure that the rack cannot move or slide on its foundation during use Make sure that the m...

Page 6: ...rming a test run on the machine The machine may not be used before a test run has been performed and all the functions of the machine have been tested Both the test run and testing can only be perform...

Page 7: ...e that there are no other people in the vicinity of the machine when loading logs Note Ensure that the log s centre of gravity stays on the conveyor 5 Machine maintenance The machine must be disconnec...

Page 8: ...8 19 HakkiFeed 422 rev A Translated Version 1 2019 Figure 6...

Page 9: ...ed and stored in a sheltered location or indoors Before prolonged storage the machine must first be cleaned then washed according to Section 5 8 and lubricated according to Section 5 5 7 Maintenance t...

Page 10: ...e 1 15 50037464 Intermediate support 4 16 50033060 Lock valve HF422 1 17 50037476 Vertical support 1 18 96058 Washer DIN 125 A12 44 19 96059 Washer DIN 125 A16 8 20 96054 Washer DIN 125 A24 2 21 96218...

Page 11: ...11 19 HakkiFeed 422 rev A Translated Version 1 2019 9 2 Assembly phases Phase 1 Assemble in accordance with Figure 7 and leave the screws loose Figure 7...

Page 12: ...12 19 HakkiFeed 422 rev A Translated Version 1 2019 Phase 2 Spread the front section Install feeder 9 first followed by support pipe 15 Leave the screws loose Figure 8...

Page 13: ...13 19 HakkiFeed 422 rev A Translated Version 1 2019 Phase 3 Install support 17 first leave the screws loose Then install intermediate support 15 leave the screws loose Figure 9...

Page 14: ...22 rev A Translated Version 1 2019 Phase 4 First install the No 30 diagonal supports Fasten the screws to the lower ends and leave them loose Then install middle pipe 14 and its screws Leave the screw...

Page 15: ...l the cylinder part 10 Tighten all the screws installed so far Figure 11 Phase 6 Install roller 13 bearing 12 on the end Leave the screws loose Then push hydraulic motor 11 into place Tighten the hydr...

Page 16: ...the No 8 rollers as shown in Figure 13 Install the No 33 cylinder hoses Lower marked red upper black Figure 13 Install the USIT seals 31 nipples 32 and hydraulic hoses 33 shorter hose red 34 longer ho...

Page 17: ...17 19 HakkiFeed 422 rev A Translated Version 1 2019 Phase 8 Install the No 4 extensions and their screws Tighten the screws Finish by inspecting the assembly Figure 15...

Page 18: ...guarantee does not cover Damage caused by normal wear and tear e g rollers and wear parts improper use or use contrary to the instruction manual Damage caused by negligence of maintenance or storage...

Page 19: ...to compile the technical file Name Timo Jussila Address Valimotie 1 FI 85800 Haapaj rvi The aforementioned person assures that HakkiFeed 422 log rack Hakki Pilke firewood processor accessory Serial n...

Reviews: