Model 410
Owner’s Manual
6/24/2014
11
Installation Steps and Start-Up Procedures
We recommend that you have your water treatment specialist install and maintain this appliance. Each water
treatment appliance comes with 8 feet (2.4 meters) of drain line.
Step 1
Prepare the Placement Area
A.
Make sure the placement area is clean.
B.
Turn off the electricity and water supply to the water heater. For gas water heaters, turn the
gas cock to “Pilot.”
C.
Examine the inlet plumbing to ensure that the pipe is not plugged with lime, iron, or any
other substance. Clean or replace plugged plumbing.
Note:
A minimum 3/4-inch (19-mm) pipe is required between the pressure tank (if equipped)
and the appliance for the appliance to function properly.
Figure 2: Appliance Placement
Summary of Contents for Maximizer 410
Page 35: ...Notes...