02
. ASSEMBLING THE SUPERSTRUCTURE ELEMENTS
05
06
01
02
03
04
Take the control centre assembly from the previous
stage and check the fit in the recess on the lower
mast deck as shown.
Remove the railing
6
from the metal frame
32-07
.
Glue it in place on the port side of the superstructure,
to form a railing for platform
C1
(fitted in stage 23).
Similarly, glue railing
7
to platform
C3
on the other
side of the superstructure deck.
Place the superstructure deck on your worktop. Fit
the bridge deck assembly so that all cables run down
into the large recess of the superstructure deck, as
indicated by the arrow.
Carefully turn the assembly over, taking care not to
damage any parts. Fix the superstructure decks
together using four
PB 2 x 5
mm screws (supplied
with the previous stage).
6
7
PB
PB
PB
C1
C3
When fitting the control centre, take care not to
damage the parts that are already in place. Press
down gently on the assembly so that it fits snugly,
with no gaps. This is a very tight push-fit.
11
11
AGORA
MODELS
PB
AGORA
MODELS