![Hach PAT700 DS Basic User Manual Download Page 14](http://html1.mh-extra.com/html/hach/pat700-ds/pat700-ds_basic-user-manual_3196958014.webp)
7.
Tighten the compression nut another 1¼ turns.
8.
Do a leak test:
a.
Slowly open the isolation valve to let water into the instrument.
b.
Open and close the valve several times to pulse water through the connections.
c.
Examine the compression fittings for leaks.
d.
If necessary, slowly tighten the compression fittings to stop leaks.
Figure 6 Plumb the instrument
1
Process pipe
4
Drain tubing, ¼-in.OD
2
Isolation valve, customer-supplied
5
Drain
3
Water in tubing, ¼-in. OD
User interface and navigation
After startup, the user interface shows the home screen. Refer to
.
14
English
Summary of Contents for PAT700 DS
Page 2: ...English 3 Français 26 Español 50 Português 74 中文 98 中文 121 日本語 144 한글 167 2 ...
Page 9: ...Figure 2 Installation dimensions English 9 ...
Page 32: ...Figure 2 Dimensions de l installation 32 Français ...
Page 56: ...Figura 2 Dimensiones de instalación 56 Español ...
Page 80: ...Figura 2 Dimensões de instalação 80 Português ...
Page 104: ...图 2 安装尺寸 104 中文 ...
Page 127: ...图 2 安裝尺寸 中文 127 ...
Page 150: ...図 2 取り付け寸法 150 日本語 ...
Page 173: ...그림 2 설치 치수 한글 173 ...
Page 190: ......
Page 191: ......