3
Installing the AP
Installation flowchart
Figure 3 Installation flowchart
Pre-installation tasks
Before installing the AP, perform the following tasks:
•
Connect the AP to a power source and the network. Examine the LEDs to verify that the AP
operates correctly. For information about AP LEDs, see "
."
•
Record the MAC address and serial number at the rear of the AP for future use.
•
Make sure you have completed cabling at the installation site.
Determining the installation position
Determine the installation position by observing the following principles:
•
Few obstacles such as wall exist between the AP and clients.
•
The AP is far away from electronic devices (such as microwave oven) that might generate
radio frequency (RF) noise.
•
The AP does not hinder people’s daily work and life.
•
The place is not water seeping, water soaking, and condensing.
•
The AP is more than 5 m (16.40 ft) away from 3G and 4G base stations and antennas.
Mount the AP
Mount the AP on a wall
Connect the AP to
the power source
Start
Connect the AP to
the network
Pre-installation
tasks
End
Connect IoT access
units
Mount the AP on a ceiling