
18
Figure 12 Inserting the RPE-X1 into the slot
4.
Fasten the captive screws on the RPE-X1.
5.
Observe the RUN LED on the RPE-X1 to verify that the RPE-X1 is installed correctly.
After the router is powered on, the RUN LED on the RPE-X1 flashes green at 8 Hz until the
application software is loaded. When the RUN LED flashes green at 1 Hz, the RPE-X1 is
operating correctly.
Installing an RSE-X1 MPU
1.
Locate the slot to install the RSE-X1.
You can install an RSE-X1 in slot 5 or slot 6. This procedure uses slot 5 as an example.
2.
Loosen the captive screws on the filler panel in slot 5, and then remove the filler panel
3.
Use even pressure to gently push the RSE-X1 into slot 5 along the slide rails, and then push the
ejector levers inward to lock the RSE-X1 in position.