18
3.
Correctly orient the switching fabric module. Align the switching fabric module with the target
slot and insert it into the slot along the guide rails. Then fully open the ejector levers.
4.
Continue to push the switching fabric module by its front panel until the ejector levers make
close contact with the slot edges.
5.
Close the ejector levers until the locking tabs lock the ejector levers in place.
Figure 2-17 Installing a switching fabric module for an M9000-AI-E08 gateway
Installing a switching fabric module for an M9000-AI-E16
gateway
1.
Place the switching fabric module on a workbench and remove the protection box from the
connector side of the switching fabric module.
Figure 2-18 Removing the protection box