background image

 

Figure 2 Airflow through the chassis (M9000-AI-E16 gateway) 

 

 

Power 

A good power supply system is essential for correct operation of the gateway. The gateway supports 
AC and DC power inputs. Make sure the equipment room meets the following requirements for the 
power supply systems. 

 

The AC power supply system is stable and reliable and capable of providing power required by 
the gateway. Prepare a diesel generator as a backup power source except for the power lines. 

 

The DC power supply system is stable and reliable and its output voltage is stable and within 
the acceptable range allowed by the gateway. 

 

Enough batteries are available to ensure uninterrupted device operation in the event of a power 
failure. 

For the power supply system to provide power as required by the router: 

1. 

Calculate the system power consumption. 

The system power consumption varies by module type and density. For more information about 
system power consumption calculation, see "Appendix B Technical Specifications." 

2. 

Select power supplies and identify the number of power supplies. 

The total maximum output power of all power supplies must be higher than the system power 
consumption. For more information about available power supplies, see "Appendix A FRUs and 
Compatibility Matrixes." 

Summary of Contents for SecPath M9000-AI-E8

Page 1: ...tions 1 Electricity safety 1 Handling safety 1 ESD prevention 1 Laser safety 2 Examining the installation site 2 Weight support 2 Space 2 Cooling 3 Power 4 Lightning protection 5 Temperature 5 Humidit...

Page 2: ...ngrounded power extension cables missing safety grounds and wet floors Locate the emergency power off switch in the room before installation so you can quickly shut power off when an electrical accide...

Page 3: ...sure the floor can support the total weight of the rack chassis and accessories Additionally the floor loading plan must also consider system expansion such as adding more modules For more information...

Page 4: ...e screw of the fan tray at the chassis rear Figure 1 Rack dimensions Cooling The gateway uses front to rear airflow for heat dissipation Plan the installation site for the gateway based on its airflow...

Page 5: ...t voltage is stable and within the acceptable range allowed by the gateway Enough batteries are available to ensure uninterrupted device operation in the event of a power failure For the power supply...

Page 6: ...to a high temperature environment dry the chassis before powering it on to avoid short circuits If the temperature in the equipment room is too high too low or changes dramatically the device reliabi...

Page 7: ...ents as shown in Table 5 Table 5 Harmful gas limits in an equipment room Gas Max mg m 3 SO2 1 0 H2S 0 5 NH3 3 0 Cl2 0 3 NO2 1 0 EMI Electromagnetic interference EMI might be coupled from the source to...

Page 8: ...ies Pre installation checklist Table 6 Pre installation checklist Item Requirements Result Installation site Load bearing The floor or ground at the installation site can support the sum of the weight...

Page 9: ...rotective earthing systems of the communication power supplies use the same earthing conductor set with the protective earthing system of the communication devices Temperature 0 C to 45 C 32 F to 113...

Reviews: