background image

 

 

Put modules away in antistatic bags for future use. 

 

 

NOTE: 

The gateway has an ESD socket at both the front and rear. 

 

Laser safety 

 

WARNING! 

  Disconnected optical fibers or transceiver modules might emit invisible laser light. Do not stare 

into beams or view directly with optical instruments when the gateway is operating. 

  Before you remove the optical fiber connector from a fiber port, execute the 

shutdown

 

command in interface view to shut down the port. 

 

 

CAUTION: 

  Insert optical fiber caps into open optical fiber connectors to protect them from contamination and 

ESD damage. 

  Insert dust plugs into open fiber ports and transceiver module ports to protect them from 

contamination and ESD damage. 

 

Examining the installation site 

The gateway must be used indoors. To ensure the correct operation and long service life of your 
gateway, the installation site must meet the requirements in this section. 

Weight support 

Make sure the floor can support the total weight of the rack, chassis, and accessories. Additionally, 
the floor loading plan must also consider system expansion, such as adding more modules.  For 
more information, see "Appendix B Technical Specifications." 

Space 

For easy installation and maintenance, make sure the following requirements are met: 

 

Make sure the rack has enough space (in height and depth) to accommodate the gateway. 

 

The rack allows front and rear access to the gateway. 

 

A minimum clearance of 1.2 m (3.94 ft) is reserved between the rack and walls or other devices. 

For more information about the chassis dimensions, see "Appendix B Technical Specifications." 

Table 1 Gateway dimensions and rack requirements 

Model 

Chassis dimensions 

Rack requirements 

M9000-AI-E8 

 

Height

—264 mm (10.39 in) 

 

Width

—440 mm (17.32 in) 

 

Depth

—977 mm (38.46 in) 

 

857 mm (33.74 in) for the 
chassis 

 

90 mm (3.54 in) for the cable 
management brackets at the 

 

A minimum of 1.1 m (3.61 ft) in depth 
(recommended). 

 

A minimum of 140 mm (5.51 in) between 
the front rack posts and the front door. 

 

A minimum of 950 mm (37.40 in) between 
the front rack posts and the rear door. 

Summary of Contents for SecPath M9000-AI-E8

Page 1: ...tions 1 Electricity safety 1 Handling safety 1 ESD prevention 1 Laser safety 2 Examining the installation site 2 Weight support 2 Space 2 Cooling 3 Power 4 Lightning protection 5 Temperature 5 Humidit...

Page 2: ...ngrounded power extension cables missing safety grounds and wet floors Locate the emergency power off switch in the room before installation so you can quickly shut power off when an electrical accide...

Page 3: ...sure the floor can support the total weight of the rack chassis and accessories Additionally the floor loading plan must also consider system expansion such as adding more modules For more information...

Page 4: ...e screw of the fan tray at the chassis rear Figure 1 Rack dimensions Cooling The gateway uses front to rear airflow for heat dissipation Plan the installation site for the gateway based on its airflow...

Page 5: ...t voltage is stable and within the acceptable range allowed by the gateway Enough batteries are available to ensure uninterrupted device operation in the event of a power failure For the power supply...

Page 6: ...to a high temperature environment dry the chassis before powering it on to avoid short circuits If the temperature in the equipment room is too high too low or changes dramatically the device reliabi...

Page 7: ...ents as shown in Table 5 Table 5 Harmful gas limits in an equipment room Gas Max mg m 3 SO2 1 0 H2S 0 5 NH3 3 0 Cl2 0 3 NO2 1 0 EMI Electromagnetic interference EMI might be coupled from the source to...

Page 8: ...ies Pre installation checklist Table 6 Pre installation checklist Item Requirements Result Installation site Load bearing The floor or ground at the installation site can support the sum of the weight...

Page 9: ...rotective earthing systems of the communication power supplies use the same earthing conductor set with the protective earthing system of the communication devices Temperature 0 C to 45 C 32 F to 113...

Reviews: