background image

Contents 

Preparing for installation ················································································ 1

 

Safety recommendations ··································································································································· 1

 

Safety symbols ··········································································································································· 1

 

General safety recommendations ·············································································································· 1

 

Electricity safety ········································································································································· 1

 

Laser safety ················································································································································ 2

 

Examining the installation site ···························································································································· 2

 

Temperature and humidity ························································································································· 2

 

Cleanliness ················································································································································· 2

 

Cooling system ··········································································································································· 3

 

ESD prevention ·········································································································································· 3

 

EMI ····························································································································································· 4

 

Lightning protection ···································································································································· 4

 

Rack-mounting ··········································································································································· 5

 

Installation tools and accessories ······················································································································ 5

 

Pre-installation checklist····································································································································· 6

 

 

Summary of Contents for MSR 5600

Page 1: ...eral safety recommendations 1 Electricity safety 1 Laser safety 2 Examining the installation site 2 Temperature and humidity 2 Cleanliness 2 Cooling system 3 ESD prevention 3 EMI 4 Lightning protectio...

Page 2: ...ndations Keep the chassis and installation tools away from walk areas Make sure the ground is dry and flat and anti slip measures are in place Unplug all the external cables including power cords befo...

Page 3: ...orrosion Lasting low relative humidity can cause washer contraction and ESD and bring problems including loose captive screws and circuit failure High temperature can accelerate the aging of insulatio...

Page 4: ...arance of 10 cm 3 94 in for the air inlet and outlet vents The installation site has a good cooling system ESD prevention CAUTION Check the resistance of the ESD wrist strap for safety The resistance...

Page 5: ...ing tasks If AC power is used use a single phase three wire power receptacle with protection earth PE to filter interference from the power grid Keep the router far away from radio transmitting statio...

Page 6: ...no less than 3 m 9 84 ft Installation tools and accessories Figure 2 Installation tools Figure 3 Installation accessories Multimeter Flathead screwdriver Phillips screwdriver Needle nose pliers Wire...

Page 7: ...ing stations radar stations and high frequency devices Electromagnetic shielding for example shielded interface cables is used as required Lightning protection The device is reliably grounded The AC p...

Page 8: ...7 Item Requirements Result Reference Documents shipped with the router are available Online documents are available...

Reviews: