background image

ASSEMBLY INSTRUCTIONS  

WTPSS41CE PRESENTATION STATION

Figure 1

PARTS LIST:

1.  (8) Grooved Legs

2.  (2) Perforated Back Panels

3.  (1) Right Side Cabinet Door Panel

4.  (1) Swing Down Cabinet Door (upper)

5.  (4) Casters

6.  (1) Upper Right Panel

6.  (2) Left Perforated Side Panels

Place the four fluted legs over the corner posts (bosses) of the bottom shelf so that 

the channels face each other.  Use a rubber mallet to tap legs into place.  Make sure 

that legs are even and fully seated. (FIGURE 1)  

LOWER CABINET- Locate back & front ventilated panels (ventilation holes, are 24"W 

and do not have doors) and slide down into grooves of the 2 back legs.  Slide other 

one into the front grooves.  Slide lower left side panel into left front & back leg 

grooves.  Slide Right Cabinet Door into grooves on opposite side.

Take middle shelf and place onto legs so that the bosses are fitting into the holes in 

the top of the legs. Be sure that the ribbed side is facing down. Push shelf down as 

far as you can by hand.  Gently tap with mallet if necessary. 

shows how to insert panel 

into channel.  Upper right 

panel shown.

8.  (1) Right Side Cabinet Door Panel (lower)

9.  (1) LCD Projector Shelf Assembly

10.  (1) Perforated Lower Front Panel

11.  (1) Electrical Assembly with Hardware

12.  

(1) EACH top shelf (handle), middle shelf (8 bosses) & bottom shelf (4 bosses)

H. Wilson Company

555 West Taft Drive

South Holland IL 60473

Phone: (800) 245-7224

[email protected]

***READ INSTRUCTIONS BEFORE BEGINNING ASSEMBLY

***BACK & FRONT OF SHELVES ARE 24"W, SIDES ARE 18"W

Tools Required: Rubber Mallet    Phillips Head Screwdriver

Reviews: