12
30SB,
36SB,
45SB
Rev Nov2014
Snow BEAST
Assembly Instruc ons
Step 7: Auger and Transmission Control Cables
Control
cables
are
preset
at
the
factory,
but
may
require
addi onal
adjustment
for
op mal
opera on.
Control
cables
require
periodic
inspec on
and
maintenance
to
maintain
op mal
performance.
1.
Locate
the
black
cable
on
the
right
side
(standing
from
the
operator
posi on)
of
the
snow
blower.
Ensure
the
cable
is
properly
seated
in
the
plas c
guide
pulley
at
the
rear
of
the
chassis.
2.
A ach
the
cable
to
the
threaded
end
under
the
drive
control
handle.
The
cable
adjustment
tube
with
Z
rod
may
need
to
be
a ached
to
the
bo om
of
the
handle.
3.
Screw
clockwise
to
secure
un l
all
threads
are
engaged
in
the
adjustment
tube.
Tighten
lock
nuts
when
correct
tension
is
achieved.
4.
The
drive
and
impeller
cables
will
be
at
correct
tension
when
the
cables
are
properly
a ached
to
the
handles
and
the
cable
has
a
1
inch
de
fl
ec on
to
either
side
when
pushed
with
a
fi
nger
as
shown.
Repeat
the
same
process
for
the
Auger/Impeller
engagement
cable
on
the
le
side
of
the
snow
blower.
Correct
amount
of
de
fl
ec on
shown
Need Help With Assembly?
(919)
‐
550
‐
3221
Transmission
Control
Cable
Auger/Impeller
Control
Cable