9
30SB,
36SB,
45SB
Rev Nov2014
Snow BEAST
Assembly Instruc ons
Step 1: Control Panel Handles
1.
Align
the
two
holes
on
each
side
of
the
control
panel
handles
over
the
lower
handle
frame.
2.
Insert
the
bolts
through
the
handlebar
holes
and
frame
holes.
Secure
in
place
with
hardware
provided.
Insert
bolts
from
the
inside.
Step 3: Chute Rota on Cable
A ach
the
cable
coming
from
the
middle
of
the
control
panel
by
screwing
the
cable
end
onto
the
crank
sec on.
See
next
page
for
speci
fi
c
instruc ons
regarding
this
assembly.
Need Help With Assembly?
1
‐
919
‐
550
‐
3221
Step 2: Direc onal Discharge Chute
1.
Fit
the
black
plas c
round
spacer
onto
impeller
housing
before
installing
chute.
Apply
light
coat
of
grease
onto
spacer.
2.
Install
the
bolts
for
the
retainer
brackets
with
the
plas c
spacer
between
the
chute
and
the
steel
retaining
tabs.
DO
NOT
OVERTIGHTEN.
If
the
bracket
is
too
ght
the
chute
will
not
move
properly.
Ensure
there
is
enough
space
between
the
impeller
housing
and
the
bracket
on
all
sides
so
that
the
chute
rotates
smoothly.