21
.............................
CCEC/ OM Manual GlasStile GSR 1.6 EN
07
.2009
Section 5
Installation
Installation
Unpacking
Check that all the material has been delivered intact. Gunnebo does not accept responsibility
for any damage that occurs by transportation or installation.
Electrical installation must be carried out by authorised staff. The placing, installation and
specifications of all cables must comply with the instructions given in this document.
Gunnebo does not accept responsibility for any injury or damage incurred due to departure from
the instructions in this Technical Manual.
Tools Required
Industrial hammer drill
Concrete drill bit 12mm
Socket 17mm AF (x2)
Torque wrench
8mm Spanner
Metric Allen Keys (1 x set)
Please read carefully before commencing the installation
Site Preparation
The following illustrations show the site preparation details that are required.
Concrete to BS 5328:1997 specifications - Type ST5
The base must be flat and level to +/-5mm over the GlasStile GSR area.
The base must be laid with under floor conduits with a minimum diameter of 20mm, rising in the
positions indicated on the relevant illustration to accommodate the cables for power supplies
and any remote control devices.
It is recommended that the mains power to the unit passes through a Residual Current Circuit
Device for maximum safety.
A second conduit should be provided for any remote control cables that may be required. On
units controlled by pushbuttons or footswitches, a four-core cable having a minimum conductor
size of 0.5mm sq. should be laid and a 1.5m tail left. (Screened cables are NOT normally
required)
For units that are to be controlled by Card Access or similar it is recommended that Gunnebo
Technical Personnel be advised prior to starting the installation routines.
Installation Kit
Item
Quantity
Rotor Assembly
1
Cladding Kit inc. covers
1
Top Cap
1
Glass Panel
3
Framework
1
Anchor Bolts (72544001)
15