background image

 

 

  

 
 
 
 
 
 
 

Installation and User’s Manual 

 
 

Global Tracking and Tracing System 

 

GTTS-2000Bi 

 

Version 1.1 June 2009 

 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

GTTSystems B.V.

  

Herfordstraat 16  7418 EX  Deventer, The Netherlands  

T

 0570 605075 

 

F

 0570 677755 

 

E

 

[email protected]  

W

 

www.gtts.eu  

Summary of Contents for GTTS-2000Bi

Page 1: ...n and User s Manual Global Tracking and Tracing System GTTS 2000Bi Version 1 1 June 2009 GTTSystems B V Herfordstraat 16 7418 EX Deventer The Netherlands T 0570 605075 F 0570 677755 E info gtts eu W w...

Page 2: ...ling the GTTS 2000Bi Do not store the GTTS2000Bi on a metal shelf This will drain the battery There are no user serviceable parts inside Do not open the GTTS 2000Bi under any circumstances If the inte...

Page 3: ...ION 4 2 INSTALLATION 6 2 1 UNPACKING 6 2 2 ACTIVATION IN THE IRIDIUM NETWORK 6 2 3 INSTALLATION GENERAL READ THIS FIRST 6 2 3 1 INSTALLATION WITH MAGNET MOUNTING 7 2 3 2 INSTALLATION WITH SCREW MOUNTI...

Page 4: ...ed to survive under the most extreme conditions The GTTS 2000Bi runs from an application specific designed integrated battery pack that will guarantee fail safe operation under the most extreme temper...

Page 5: ...For optimum data transport efficiency and cost effectiveness reasons two position reports are packed into one Iridium message Depending on the end user s application it is often desired to use geogra...

Page 6: ...day during GTTSystems B V business hours Your subscription starts from this day 2 3 Installation general READ THIS FIRST The GTTS 2000Bi is very easy to install It shall be installed in horizontal po...

Page 7: ...s make contact with the steel surface Try to do this as controlled as possible to avoid a slam and keep your fingers free from the GTTS 2000Bi surface contact area Slamming the unit onto the steel sur...

Page 8: ...bolts shall not be longer then 18mm plus the steel surface thickness Drill 4 holes 5 5 mm according the drill plan See figure below X is steel surface thickness Figure 4 Drill plan Bolt M5 maximum len...

Page 9: ...nd the average time needed on the Iridium network to send a message a prognoses of the battery life span related to several reporting time interval was calculated Depending on the reporting frequency...

Page 10: ...eep 160 A Estimated Nr Of Transmission from 1 Battery 2000 10000 Sensors Motion Sensor used to control reporting frequency Ferro Detector used as turn on off switch and removal sabotage detector Satel...

Reviews: