28
ZY120 1-3kVA User Manual EN rev.08.docx
Annex C. Rated Parameters Setting
Rated parameters of ZY120 1-3K UPS can be set from panel.
WARNING:
Wrong configuration of rated UPS parameters can damage the applied load.
Please set rated parameters in according to the following procedures:
1)
Start UPS power supply and ensure that rectifier, inverter, bypass and discharge are not
working.
2)
Press ON/OFF and FUNC together for 2.5 seconds to enter in setting mode, all LEDs flicker.
3)
Voltage setting: press FUNC to change rated voltage. Shown as following:
VAC
INPUT
VAC
OUTPUT
CONVERTER
BYPASS
LOAD
Current Rated
Voltage
4)
Frequency setting: Press ON/OFF to choose voltage and enter in frequency setting. Press
FUNC to change rated frequency. Shown as following:
INPUT
OUTPUT
LOAD
CONVERTER
BYPASS
Current Rated
Frequency
Hz
Hz