GSWeb Playground Equipment GS-W6002 Installation Manual Download Page 1

1

HEXAGON NET CLIMBER

MODEL NO.

GS-W6002

INSTALLATION MANUAL

SHINHEUNG   ENG

1046-3, Najeon-ri, Saengnim-myeon, 
Gimhae-si Gyeongsangnam-do, 621-821, 
Republic Of Korea   
Tel) +82. 55. 326. 9096~7  
Fax) +82. 55. 326. 9022
E-mail) [email protected]
Web site) www.gsweb21.com

Summary of Contents for GS-W6002

Page 1: ...EL NO GS W6002 INSTALLATION MANUAL SHINHEUNG ENG 1046 3 Najeon ri Saengnim myeon Gimhae si Gyeongsangnam do 621 821 Republic Of Korea Tel 82 55 326 9096 7 Fax 82 55 326 9022 E mail gswebinfo chol com...

Page 2: ...structure made of steel loaded Nylon cables and comes protected against UV The 6001 features GS Web Technology which includes the highest steel content and the strongest connection materials in the in...

Page 3: ...o less than 72 in 1830mm from all sides of the play structure Fall Height a 6 3 1900mm from surface The Fall height on the extennal surface of a pyramid shaped space net is the hightest point attainab...

Page 4: ...ade Optional P1 Depth below finished Grade 12 300mm P2 Depth of concrete footing 27 1 2 700mm P1 Depth below finished Grade 12 300mm P2 Depth of concrete footing 27 1 2 700mm Figure 3 Excavate enough...

Page 5: ...e 5 Concrete footing and Anchor plate layout 100 200 100 Anchor Plate position 4 4 Positioning Anchor plate on footing CF L anchor hole Front edge of anchor plate must be installed 4 100mm from edge o...

Page 6: ...ood support frame a b b wood support frame for concrete NOTE Use anchor plate as guide for exact measurements a wood jig for Anchor plate Assemble wooden support frames 4 frames 1000mm L x 900mm W x 7...

Page 7: ...oting work concrete footing work Pour wet concrete in the wooden support frame Concrete Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to cure before proce...

Page 8: ...O GS W6002 Remove the wood support frame Figure 8 remove wood support frame Remove wood support frame from dry concrete blocks After concrete has cured enough remove frame and replace soil in area aro...

Page 9: ...W6002 Anchor Plate Assembly a Anchor Plate b Main post plate Figure 9 concreted block clean threads of L anchor bolts Figure 10 Attach Anchor plate to footing with flat washer locking washer and nut...

Page 10: ...HEXAGON NET CLIMBER MODEL NO GS W6002 Post Assembly STEP 2 Figure 12 Insert Post following Nylon string Nylon string STEP 1 Figure 11 Find Nylon String Post Assembly Insert Post following nylon strin...

Page 11: ...ure 15 Post cap assembly Figure 14 U bolt assembly Note Rubber mallet may be required to insert cap into post STEP 4 Place Cap on Post Thread the mast through the net s center per diagrams below or fo...

Page 12: ...M22 X L110 H T BOLT Safety Cable Attaching Attach safety cable to anchor plates A B C D E as shown in Figure 16 A A B C B C D D Figure 17 Safety cable Assembly After successfully preparing the net and...

Page 13: ...ER MODEL NO GS W6002 Placing Post in Position G B C E A D Figure 19 Safety cables attached Figure 18 Centre Post A B C D E F F G Working Process It is strongly ecommended that a machine be used to lif...

Page 14: ...W6002 Stand Net up A B C D E F H C B D A G E G After standing up the Net Attach remaining safety cables and Turnbuckles Figure 21 Loosen Turnbuckle all the way about 100mm leaving only 4 or 5 threads...

Page 15: ...nbuckle assembly M22 X L110 H T BOLT Anchor plate Turnbuckle a a b b c c Attaching Turnbuckle to Anchor Plates NOTE Make sure post is level before tightening and remains level during process Use turnb...

Page 16: ...o recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IP...

Page 17: ...S W6002 PARTS LIST 9 1 main post 2 multi compound rope 3 post cap 4 turn buckle 5 anchor shackle 6 shock proof ring 7 H T bolt nut washer 8 U bolt 9 main post plate 10 L anchor bolt nut washer 11 anch...

Page 18: ...LIMBER MODEL NO GS W6002 Maintenance A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope Periodic checks on tension will assist in the durabilit...

Page 19: ...corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to be...

Page 20: ...of any impact attenuating surfaces d lubrication of bearings e markig of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants h...

Reviews: