
Smart Climate 310 rev. 03 13
INSTALLATION
Mounting the Enclosure
1. Open the latch and lift the cover.
2. Remove the black caps located on each of the four
mounting holes.
3. Mount the enclosure on the wall using four screws.
Be sure the electrical knockouts are at the bottom of the enclosure in
order to prevent water from entering the controller.
4. Insert the screws in the mounting holes and tighten.
5. Fasten the four black caps provided with the controller
onto the four mounting holes. The enclosure must be
mounted in a location that will allow the cover to be
completely opened right up against the wall.
Identifying Defective Probes
An alarm is generated when a defective probe is detected. To
identify the defective probe, proceed as follows:
1. Press the
Current Conditions
button.
2. Press on the current conditions down-arrow key.
Probe readings are displayed. Dashes are displayed instead of a
reading when the probe is defective. In the case of room
temperature probes, the controller will operate according to the
temperature of the remaining probes.
Connecting Alarms Wires
There are two types of alarms:
•
If the alarm activates when
current is cut off at the input,
use the NC (normally closed)
terminal for wiring.
•
If the alarm activates when
current is supplied at the input,
use the NO (normally open) terminal for wiring.
Summary of Contents for Smart Climate 310
Page 1: ...Smart Climate 310 User s Guide 895 00676 REV 04 890 00582 REV 03...
Page 96: ...96 Smart Climate 310 rev 03 Probe Assignment...
Page 97: ...Smart Climate 310 rev 03 97 User Setup Menu...
Page 98: ...98 Smart Climate 310 rev 03...
Page 101: ...Smart Climate 310 rev 03 101 3 Press on the card and make it clip to the main board...
Page 102: ...102 Smart Climate 310 rev 03...