![GSi 40-SERIES Construction Manual Download Page 94](http://html1.mh-extra.com/html/gsi/40-series/40-series_construction-manual_2275090094.webp)
Connecting the Tension Member to the Eave Bracket
Tension members connect to the eave brackets and are installed around the inside of the bin eave.
Before You Begin
Ensure all eave angles, inside stiffeners and eave brackets are installed before proceeding.
What You Should Know
IMPORTANT:
Install bolts as shown, from the backside of the eave bracket.
1. Lift and support the tension member (D) against the outside mating surface of the eave bracket (B).
2. Install flange bolts (C) and flange nuts (A) to each end of the tension member (D).
3. Tighten to the recommended torque specifications. See
Bolt Torque Specifications, page 28
.
Figure 8-5
View of the tension plate mounting to the bin eave bracket
A
1/2 x 1-3/4 in. flange bolt (S-10252)
D
Tension member (CTR-0132)
B
Eave bracket (CTR-0429)
E
Eave angle (CTR-0721)
C
1/2 in. flange nut (S-10253)
F
Tension member bolt holes
After You Finish
Repeat this process for the remaining tension members.
94
PNEG-4472
72 Ft Diameter Z-Tek Bins
Summary of Contents for 40-SERIES
Page 6: ...NOTES 6 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 18: ...NOTES 18 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 26: ...NOTES 26 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 34: ...NOTES 34 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 72: ...NOTES 72 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Page 168: ...NOTES 168 PNEG 4472 72 Ft Diameter Z Tek Bins ...