Temperature Cable Support Package Instructions for Eave Heights
Greater than 40 ft. - 5 in. (12.32 m) (Optional)
1. For 36 ft. (10.97 m) diameter two post bins, the temperature cable support package shall span three
roof panels.
2. A rafter support system (included in each package) will be necessary for temperature cable
installation in 36 ft. (10.97 m) bins.
3. One package should be provided for each cable in the tank with the exception of the center cable.
4. All packages include hanging angle and a cable support channel (K).
5. Each set of rafters should carry only one temperature cable.
6. Each kit will contain two rafter sections (C and D), which when spliced will reach from the center
collar (G) to the bin wall. The lower rafter (C) will be bolted into the stiffener bracket (A) using
3/8 x 1 in. flange bolts (B) and 3/8 in. hex nuts (O).
Figure 9-14
Lower rafter assembly
A
Stiffener bracket (CRP-4758)
C
Lower rafter (CRP-7241)
B
3/8 x 1 in. flange bolt (S-7487)
O
3/8 in. hex nut (S-456)
PNEG-4336
36 Ft. Diameter 40-Series Bins