Page 2: ...ns photos and specifications in this manual are based on the latest information available at the time of publication The right is reserved to make changes at any time without notice 2 PNEG 2328 Grain...
Page 3: ...Bin FC Stiffened Bins 23 Installing the Main Tower to the Bin CTS Stiffened Bins 25 Chapter 5 Parts List 27 30 Main Tower Parts 28 33 Main Tower Parts 30 36 Main Tower Parts 32 36 44 5 Center Collar...
Page 4: ...NOTES 4 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 5: ...lified persons must stay out of the work area at all times Alterations must not be made to the equipment Alterations can produce dangerous situations resulting in SERIOUS INJURY or DEATH This equipmen...
Page 6: ...ol indicates an imminently hazardous situation which if not avoided will result in serious injury or death This symbol indicates a potentially hazardous situation which if not avoided can result in se...
Page 7: ...ns on your machine Keep signs in good condition Replace missing or damaged safety signs Be sure new equipment components and repair parts include the current safety signs Replacement safety signs are...
Page 8: ...nd platforms are for use by competent and trained personnel only Do not allow children or other unauthorized persons to have access to the equipment Access to the equipment must be restricted by the u...
Page 9: ...ent must be safety interlocked The following entry procedures must be followed Be aware of all possible hazards present inside the con fined space and wear personal protective equipment PPE as needed...
Page 10: ...sheet that can be used to verify that all personnel have read and understood the safety instructions This sign off sheet is provided for your convenience and personal record keeping Date Employee Name...
Page 11: ...l loads and the lateral loads are negligible 5 The system planner must incorporate the adequate allowance for the movement in the overall system such as bin settlements shrinkage and expansion after f...
Page 12: ...NOTES 12 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 13: ...bracing bottom clip 11 to the ends of the diagonal bracing 13 using 7 16 x 1 1 4 HHCS bolts 1 7 16 flat washers 5 and 7 16 flange nuts 6 NOTE Install nuts 6 to the inside of the bracing 13 flanges Fi...
Page 14: ...Main tower right leg 2 Assemble the horizontal bracing clips 12 to the main tower left leg 15 using 7 16 x 1 1 4 HHCS bolts 1 7 16 flat washers 5 and 7 16 flange nuts 6 NOTE Install nuts 6 to the insi...
Page 15: ...7 16 flat washer S 7548 16 Main tower right leg 6 7 16 flange nut S 9073 4 Connect the main tower left and right legs by installing the horizontal bracings 14 to the horizontal bracing clips 12 using...
Page 16: ...TE Install nuts 6 to the inside of the leg 15 or 16 flanges Figure 3 6 Installing the diagonal bracing clips to the main tower legs Detail views are shown from bottom 1 7 16 x 1 1 4 HHCS bolt S 3886 1...
Page 17: ...catwalk lamination 21 is applicable only for 20K towers and not for 10K towers c Install nuts 7 to the inside of the leg 15 or 16 flanges 7 Also assemble a catwalk support brace 22 between the catwal...
Page 18: ...S 3886 12 Horizontal bracing clip 5 7 16 flat washer S 7548 18 Knee brace left leg 6 7 16 flange nut S 9073 2 Assemble the horizontal bracing clips 12 to the knee brace right leg 19 using 7 16 x 1 1 4...
Page 19: ...S 7548 14 Horizontal bracing 6 7 16 flange nut S 9073 4 Install the diagonal bracing clips 10 and 11 to the knee brace left and right legs 18 and 19 using 7 16 x 1 1 4 HHCS bolts 1 7 16 flat washers...
Page 20: ...flange bolts 2 and 1 2 flange nuts 7 NOTE Install nuts 7 to the inside of the leg 18 or 19 flanges Figure 3 12 Installing the catwalk support braces to the knee brace legs 2 1 2 x 1 1 4 flange bolt S...
Page 21: ...twalk lamination 21 is applicable only for 20K towers and not for 10K towers c Install nuts 7 to the inside of the catwalk support brace 23 flanges 7 Also assemble a catwalk support brace 22 between t...
Page 22: ...tower 2 1 2 x 1 1 4 flange bolt S 9062 18 Knee brace left leg 7 1 2 flange nut S 8506 19 Knee brace right leg 15 Main tower left leg 24 Knee brace splice 16 Main tower right leg 3 Install the tension...
Page 23: ...on the stiffener 29 flanges 2 Similarly position the top hole of the second plate 27 at 4 and top hole of the third plate 27 at 11 below the top hole of the first plate 27 Mark and field drill 7 16 h...
Page 24: ...the inside of the wall attachment brackets 26 Figure 4 2 Installing the sidewall attachment brackets and sidewall attachment plates to the tower leg 2 1 2 x 1 1 4 flange bolt S 9062 16 Main tower righ...
Page 25: ...increments up to 12 Install nuts 7 to the inside of the leg 15 or 16 flanges Figure 4 4 Installing the sidewall attachment brackets to the tower leg 2 1 2 x 1 1 4 flange bolt S 9062 16 Main tower rig...
Page 26: ...NOTES 26 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 27: ...42 44 5 Center Collar Main Tower Parts 48 Main Tower Parts 48 44 5 Center Collar Main Tower Parts 30 Knee Brace Tower Parts 33 Knee Brace Tower Parts 36 Knee Brace Tower Parts 42 Knee Brace Tower Part...
Page 28: ...Chapter 5 Parts List 30 Main Tower Parts Figure 5 1 30 main tower parts 28 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 29: ...wer Diagonal C Bracing 7 EVT 0048 EVT 0048 EVT 0048 EVT 0048 Eave Tower Horizontal C Bracing 8 EVT 0126 EVT 0126 EVT 0126 EVT 0126 Eave Tower Catwalk Diagonal 9 EVT 0256 EVT 0256 Eave Tower Catwalk La...
Page 30: ...Chapter 5 Parts List 33 Main Tower Parts Figure 5 2 33 main tower parts 30 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 31: ...26 EVT 0126 EVT 0126 Eave Tower Catwalk Diagonal 9 EVT 0256 EVT 0256 Eave Tower Catwalk Lamination 10 EVT 0244 EVT 0244 EVT 0231 EVT 0231 Eave Tower Catwalk Support Brace 11 EVT 0194 BS EVT 0195 BS EV...
Page 32: ...Chapter 5 Parts List 36 Main Tower Parts Figure 5 3 36 main tower parts 32 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 33: ...0165 EVT 0165 Eave Tower Diagonal C Bracing Table 5 4 36 main tower parts list 72 wide Ref EVT 036 4CT 072 10 EVT 036 4FC 072 10 EVT 036 4CT 072 20 EVT 036 4FC 072 20 Description 1 EVT 0207 EVT 0207...
Page 34: ...Chapter 5 Parts List 36 44 5 Center Collar Main Tower Parts Figure 5 4 36 44 5 center collar main tower parts 34 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 35: ...EVT 0051 EVT 0051 EVT 0051 Eave Tower Diagonal C Bracing Table 5 6 36 44 5 center collar main tower parts list 72 wide Ref EVT 36R 4CT 072 10 EVT 36R 4FC 072 10 EVT 36R 4CT 072 20 EVT 36R 4FC 072 20 D...
Page 36: ...Chapter 5 Parts List 42 Main Tower Parts Figure 5 5 42 main tower parts 36 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 37: ...0051 EVT 0051 Eave Tower Diagonal C Bracing Table 5 8 42 main tower parts list 72 wide Ref EVT 042 4CT 072 10 EVT 042 4FC 072 10 EVT 042 4CT 072 20 EVT 042 4FC 072 20 Description 1 EVT 0202 EVT 0202...
Page 38: ...Chapter 5 Parts List 42 44 5 Center Collar Main Tower Parts Figure 5 6 42 44 5 center collar main tower parts 38 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 39: ...e Tower Sidewall Attachment Plate Bin Silver Table 5 10 42 44 5 center collar main tower parts list 72 wide Ref EVT 42R 4CT 072 10 EVT 42R 4FC 072 10 EVT 42R 4CT 072 20 EVT 42R 4FC 072 20 Description...
Page 40: ...Chapter 5 Parts List 48 Main Tower Parts Figure 5 7 48 main tower parts 40 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 41: ...0051 EVT 0051 Eave Tower Diagonal C Bracing Table 5 12 48 main tower parts list 72 wide Ref EVT 048 4CT 072 10 EVT 048 4FC 072 10 EVT 048 4CT 072 20 EVT 048 4FC 072 20 Description 1 EVT 0123 EVT 0123...
Page 42: ...Chapter 5 Parts List 48 44 5 Center Collar Main Tower Parts Figure 5 8 48 44 5 center collar main tower parts 42 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 43: ...0051 EVT 0051 Eave Tower Diagonal C Bracing Table 5 14 48 44 5 center collar main tower parts list 72 wide Ref EVT 48R 4CT 072 10 EVT 48R 4FC 072 10 EVT 48R 4CT 072 20 EVT 48R 4FC 072 20 Description...
Page 44: ...Chapter 5 Parts List 30 Knee Brace Tower Parts Figure 5 9 30 knee brace tower parts 44 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 45: ...126 EVT 0126 Eave Tower Catwalk Diagonal 9 EVT 0256 EVT 0256 Eave Tower Catwalk Lamination 10 EVT 0244 EVT 0244 EVT 0231 EVT 0231 Eave Tower Catwalk Support Brace 11 EVT 0136 EVT 0136 EVT 0129 EVT 012...
Page 46: ...Chapter 5 Parts List 33 Knee Brace Tower Parts Figure 5 10 33 knee brace tower parts 46 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 47: ...126 EVT 0126 Eave Tower Catwalk Diagonal 9 EVT 0256 EVT 0256 Eave Tower Catwalk Lamination 10 EVT 0244 EVT 0244 EVT 0231 EVT 0231 Eave Tower Catwalk Support Brace 11 EVT 0136 EVT 0136 EVT 0129 EVT 012...
Page 48: ...Chapter 5 Parts List 36 Knee Brace Tower Parts Figure 5 11 36 knee brace tower parts 48 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 49: ...e Knee Brace Left Splice 16 EVT 0139 EVT 0133 Eave Tower Single Knee Brace Right Splice Table 5 18 36 knee brace tower parts list 72 wide Ref EVT 036 072 10 K1 EVT 036 072 10 K2 EVT 036 072 20 K1 EVT...
Page 50: ...Chapter 5 Parts List 42 Knee Brace Tower Parts Figure 5 12 42 knee brace tower parts 50 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 51: ...e Knee Brace Left Splice 16 EVT 0139 EVT 0133 Eave Tower Single Knee Brace Right Splice Table 5 20 42 knee brace tower parts list 72 wide Ref EVT 042 072 10 K1 EVT 042 072 10 K2 EVT 042 072 20 K1 EVT...
Page 52: ...Chapter 5 Parts List 42 44 5 Center Collar Knee Brace Tower Parts Figure 5 13 42 44 5 center collar knee brace tower parts 52 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 53: ...e Knee Brace Left Splice 16 EVT 0139 EVT 0133 Eave Tower Single Knee Brace Right Splice Table 5 22 42 44 5 center collar knee brace tower parts list 72 wide Ref EVT 42R 072 10 K1 EVT 42R 072 10 K2 EVT...
Page 54: ...Chapter 5 Parts List 48 Knee Brace Tower Parts Figure 5 14 48 knee brace tower parts 54 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 55: ...e Knee Brace Left Splice 16 EVT 0139 EVT 0133 Eave Tower Single Knee Brace Right Splice Table 5 24 48 knee brace tower parts list 72 wide Ref EVT 048 072 10 K1 EVT 048 072 10 K2 EVT 048 072 20 K1 EVT...
Page 56: ...Chapter 5 Parts List 48 44 5 Center Collar Knee Brace Tower Parts Figure 5 15 48 44 5 center collar knee brace tower parts 56 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 57: ...e Knee Brace Left Splice 16 EVT 0139 EVT 0133 Eave Tower Single Knee Brace Right Splice Table 5 26 48 44 5 center collar knee brace tower parts list 72 wide Ref EVT 48R 072 10 K1 EVT 48R 072 10 K2 EVT...
Page 58: ...NOTES 58 PNEG 2328 Grain Bin Eave Towers 30 48 Bins...
Page 59: ...H PRODUCTS The sole and exclusive remedy for any claimant is set forth in this Limited Warranty and shall not exceed the amount paid for the product purchased This Warranty only covers the value of th...