7. Operation

The vacuum regulator doesn't have to be operated. When it is 
correctly connected, and a sufficient vacuum has built up on the 
outlet side, the vacuum regulator starts operation automatically.

7.1 Switching on the chlorine gas dosing system

1. Close the rate valve at the dosing regulator.
2. Open the shut-off valve at the injection unit.
3. Open the motive water valves.
4. Open the motive water supply of the injector.
5. Open the chlorine container valve.
6. Slowly open the rate valve, until the ball in the measuring 

glass indicates the desired gas flow.

7.2 Changing the chlorine container while the system 

is running

The red mark (empty indication) at the vacuum regulator shows 
that the minimum pressure of the chlorine container is reached. 
The container must be replaced.

1. Close the chlorine container valve.
2. Let the system run, until the measuring glass of the dosing 

regulator shows no more gas flow.

3. Close the rate valve at the dosing regulator.
4. Turn off the motive water supply.
5. Close the motive water valves.
6. Close the shut-off valves before and after the injector.
7. Unscrew the vacuum regulator from the connection of the 

container.

– Place the regulator into the wall support, if existing.

8. Screw the protective cap onto the empty chlorine container; 

put the empty containers away, and protect them from rolling 
away or turning over.

9. Position the new chlorine container, and fix it correctly.
10. Remove the protective cap from the new chlorine container.

– All connections must be absolutely clean and dry.

11. Insert the gasket at the pressure connection of the vacuum 

regulator.

– Replace the filter, if necessary.

12. Screw the vacuum regulator onto the chlorine container.

13. Check the tightness as described in section 

6.1 Checking the 

tightness

.

14. Re-start the system.

7.3 Switching off the chlorine gas dosing system

7.3.1 Emergency stop in case of gas escape

7.3.2 Emergency stop in case of small leakages

1. Put on protective equipment!
2. Immediately close the chlorine container valve.
3. Let the system run until all parts are evacuated.
4. Switch off the system as described in the following.

7.3.3 Switching off while the system is running

1. Close the chlorine container valve.
2. Let the system run, until the measuring glass of the dosing 

regulator shows no more gas flow.

3. Close the rate valve at the dosing regulator.
4. Turn off the motive water supply.
5. Close the motive water valves.
6. Close the shut-off valves before and after the injector.

8. Maintenance

Intervals for cleaning and maintenance

• At least every 12 months.
• Before every start-up.
• In case of malfunction.

Warning
Put on the required protective equipment.

Warning
Replace the gaskets at any change of chlorine 
container.
Never use the vacuum regulator without filter!

Caution

Do not align the regulator by turning the housing!
If necessary, hold up with a 13-mm fork wrench.

Warning
Check the tightness before re-starting the system.

Warning
If gas escapes, immediately leave the room, and put 
on protective equipment.
Start counter measures according to local safety 
regulations.

Warning
Repairs of components of the system are to be 
carried out only by authorised persons.

Warning
Maintenance has to be carried out only by authorised 
and qualified personnel.
Before starting cleaning and maintenance work, 
switch off the entire system.
Danger of chlorine gas escape!

Warning
Make sure that the system cannot be started 
accidentally while working at it.

Warning
Before re-starting, check the tightness.
Danger of chlorine gas escape!

Summary of Contents for Vaccuperm VGA-111

Page 1: ...Vaccuperm VGA 111 Vacuum regulator Installation and operating instructions GRUNDFOS INSTRUCTIONS Other languages http net grundfos com qr i 95714202...

Page 2: ...rst aid in case of accidents 3 1 5 Handling chlorine containers 4 1 6 Chlorine rooms 5 2 Introduction 6 2 1 Correct usage 6 2 2 Inappropriate usage 6 2 3 Qualification of the users 6 2 4 Responsibilit...

Page 3: ...ive equipment Outside the chlorine rooms Well visible Easily available at any time Protected from dust and moisture 1 4 First aid in case of accidents 1 4 1 First aid after inhaling chlorine 1 Keep ca...

Page 4: ...atures over 50 C Transport containers only with valve protection nut and protective cap 1 5 4 Valid regulations In Germany the following regulations apply Regulations for accident prevention Chlorinat...

Page 5: ...ust have a run off with air trap Operation must be possible manually from outside the chlorine rooms A chlorine gas warning system must be installed with optical and acoustical alarm device with conne...

Page 6: ...ate protective clothing in accordance with national regulations for the prevention of accidents when operating the system and handling chemicals 2 4 Responsibilities of the operator The operator of th...

Page 7: ...n B Directly on the cylinder W Wall mounting C Header line BC Directly on the cylinder header line Connection 1 G 1 2 G 3 4 3 U S yoke 4 Copper pipe 6 8 mm Inlet valve B Basic S Short L Long 230 240 V...

Page 8: ...cal indication Weight Approx 2 4 kg according to the execution of the pressure connection Pressure gauge 0 16 bar with without limit contact for setting the minimum admission pressure Short inlet valv...

Page 9: ...t 34 05 C Density gas 3 214 g l at 0 C 1 bar 1 litre of liquid chlorine at 0 C is equivalent to 457 litres 0 457 m3 of chlorine gas 1 kg of liquid chlorine at 0 C is equivalent to 311 litres 0 311 m3...

Page 10: ...ich reduces the overpressure from the chlorine tank side to the negative pressure on the vacuum side The valve at the vacuum regulator opens when after switching on the injector a sufficient vacuum ha...

Page 11: ...ap are available for more safety Dosing regulator C The chlorine gas volume flow is adjusted with the dosing regulator This can be effected manually or automatically via motor control Injector D Injec...

Page 12: ...tions Max length m of the vacuum lines between vacuum regulator and dosing regulator Dosing quantity g h 40 100 250 500 1000 2000 4000 0 DN 8 DN 8 DN 8 DN 8 DN 8 DN 8 DN 10 10 DN 8 DN 8 DN 8 DN 8 DN 8...

Page 13: ...or 2 Overpressure line to the adsorption filter 3 Vacuum line from the vacuum regulator 4 Vacuum line to the injector Warning Replace the gaskets of the pressure connection at any change of container...

Page 14: ...se all chlorine container valves 2 Open container connection valves and all shut off valves up to the chlorine gas dosing system 3 Open the connection valve of the nitrogen cylinder 4 Slowly open the...

Page 15: ...the valves of full or empty chlorine containers with closing nut marked chlorine or Cl2 and gasket Stuck valves Stuck valves can be loosened by wrapping a cloth with warm water around the valve If thi...

Page 16: ...um regulator onto the chlorine container 13 Check the tightness as described in section 6 1 Checking the tightness 14 Re start the system 7 3 Switching off the chlorine gas dosing system 7 3 1 Emergen...

Page 17: ...tainer damaged Use another chlorine container d Pressure connection loose Tighten the pressure connection e Sealing surface at the pressure connection of the vacuum regulator damaged Call the service...

Page 18: ...kich PT Declara o de conformidade UE A Grundfos declara sob sua nica responsabilidade que os produtos VGA 111 VGA 113 VGA 117 VGA 146 VGB 103 VGS 141 VGS 143 VGS 145 VGS 147 VGS 148 aos quais diz resp...

Page 19: ...19 Declaration of conformity EAC 2 Vaccuperm 004 2011 010 2011 020 2011 TC RU C DK 30 01214 17 12 2019 153032 1 Vaccuperm 032 2013 TC N RU DK 30 05343 08 10 2020 1 2016 143581 188...

Page 20: ...20...

Page 21: ...ia S r l Via Gran Sasso 4 I 20060 Truccazzano Milano Tel 39 02 95838112 Telefax 39 02 95309290 95838461 Japan GRUNDFOS Pumps K K 1 2 3 Shin Miyakoda Kita ku Hamamatsu 431 2103 Japan Phone 81 53 428 47...

Page 22: ...splayed in this material including but not limited to Grundfos the Grundfos logo and be think innovate are registered trademarks owned by The Grundfos Group All rights reserved 2019 Grundfos Holding A...

Reviews: