7.1 Motor protection

The pumps are provided with the following type of motor 
protection:
Standard SRP pumps incorporate three bimetallic PTO thermal 
switches (PTO = Protection Thermique á Ouverture). See fig. 17.
Explosion-proof SRP pumps incorporate three PTC sensors 
(temperature sensors) according to DIN 44 081. See fig. 18.

Function of thermal switches

The motor is protected against overheating by three thermal 
switches connected in series, one switch in each winding. 
When the maximum winding temperature is reached, the switch 
will open the circuit and stop the motor.
When the windings have cooled to normal temperature, the 
switch will close the circuit and the motor can be restarted. 
Manual restarting is necessary.
See wiring diagram in fig. 17, section 

7.5 Wiring diagrams

.

Thermal switches (F6)

• Two conductors (terminals 11 and 12).
• Maximum operating voltage of switch: 250 V.
• Maximum switching current: 2.5 A at cos 

φ

 = 1.

• Cutting-out temperature: 150 °C.

Function of PTC sensors

The motor is protected against overheating by three thermal 
sensors connected in series, one in each winding. When 
overheated, the motor will stop. Automatic restarting is not 
permitted in such cases. This requires a thermistor trigger unit 
with a reconnection suppressor in the control circuit of the motor 
contactor.
See wiring diagram in fig. 18, section 

7.5 Wiring diagrams

.

ϑ

1, 

ϑ

2, 

ϑ

3: PTC sensors: 

• Two conductors (terminals 31 and 32). 
• Maximum voltage at the terminals: U

max. 

= 2.5 V (AC/DC). 

• Resistance between terminals 31 and 32:

- at room temperature R = 150 to 750 

Ω

.

- at cutting-out temperature (130 °C) R 

 4000 

Ω

.

7.2 Gearbox protection

The gearbox is monitored for the ingress of water by a leak 
sensor incorporated in the gearbox.
If the monitoring function is required, the leak sensor must be 
connected to a Grundfos relay, type ALR-20/A-Ex. 
The ALR-20/A-Ex relay must be ordered separately. 
Product number: 96489569.

For longer distance, use an additional, screened cable. 
An external alarm indicator, if any, must be connected to the 
potential-free outputs, terminals 1 and 3 or 4, respectively. 
Maximum load: 250 V, 5 A.

When the ALR-20/A-Ex relay is connected, a current of up to 
10 mA will flow through the leak sensor (terminals 21 and 22). 
If water penetrates into the oil chamber, the relay will trigger an 
alarm signal and/or switch off the motor.
See wiring diagram in fig. 17 or 18, section 

7.5 Wiring diagrams

.

Leak sensor

• Two conductors (terminals 21 and 22).
• Maximum operating voltage: Approx. 12 V.
• Maximum current: 1 to 10 mA.
To adjust the sensitivity of the ALR-20/A relay, proceed as 
follows:
1. Turn adjusting screw (pos. a) on the relay until indicator light 

(pos. b) illuminates.

2. Turn the adjusting screw in the opposite direction until the 

indicator light goes out.

3. Continue to turn the adjusting screw 60 ° (same direction as 

instep 2).

Note

For transmission tests at terminals 31 and 32, the 
test voltage must not exceed 2.5 V (AC/DC).
Use an ohmmeter for the test.

Warning

Explosion-proof pumps must be protected 
against too high temperature by means of PTC 
sensors. The sensors must be connected to a 
certified signal converter.

Warning

Explosion-proof pumps must be connected to the 
Grundfos relay, type ALR-20/A Ex. 

Classification: II (2)G [Ex ib] IIC

Product number: 96489569

Note

The cable between the relay and the pumps must 
be maximum 50 m.

Warning

If the supply cable to the sensor is lengthened, 
comply with the ATEX directive as well as the 
EN 60079-0 and EN 60079-14 standards for the 
intrinsically safe circuit.

The terminal connections of the intrinsically safe 
and the not intrinsically safe circuits must be 
separated and must be clearly distinguishable. 

The operator must make sure that all installation 
work is done in conformity with the relevant 
standards.

Summary of Contents for SRP 70.30.814.25.Ex.5.1D.A

Page 1: ...GRUNDFOS INSTRUCTIONS SRP 50 Hz Installation and operating instructions...

Page 2: ......

Page 3: ...121 Italiano IT Istruzioni di installazione e funzionamento 136 Lietuvi kai LT rengimo ir naudojimo instrukcija 150 Magyar HU Szerel si s zemeltet si utas t s 164 Nederlands NL Installatie en bedienin...

Page 4: ...estimmt und mit einem separaten ATEX Typenschild und einem EG Pr fzeugnis ausgestattet sind Weitere Informationen siehe unten EE Vastavusdeklaratsioon Meie Grundfos deklareerime enda ainuvastutusel et...

Page 5: ...l valamint rendelkeznek EK t pus vizsg lati bizonylattal is Tov bbi inform ci kat l sd alul NL Overeenkomstigheidsverklaring Wij Grundfos verklaren geheel onder eigen verantwoordelijkheid dat het prod...

Page 6: ...2006 42 EC Kori en standard EN ISO 12100 2003 Direktiva niskog napona 2006 95 EC Kori eni standardi EN 60034 EN 60204 2006 EMC direktiva 2004 108 EC Kori eni standardi EN 61000 6 2 2005 EN 61000 6 3...

Page 7: ...15 8 Start up 15 9 Service 16 9 1 Contaminated pump 16 9 2 Service chart 17 9 3 Oil 18 9 4 Oil change 18 10 Fault finding 19 11 Technical data 20 11 1 Motor 20 11 2 Gearbox 20 11 3 Shaft seals 20 11 4...

Page 8: ...ch individual case Example SRP 70 30 814 25 Ex 5 1D A Type range SRP Submersible recirculation pump Motor output power P2 P2 Code from type designation 10 kW 70 7 kW Impeller diameter cm 30 30 cm Impe...

Page 9: ...code 3 Impeller diameter 4 Liquid temperature range 5 Product number 6 Enclosure class according to IEC 7 Serial number 8 Insulation class 9 Rated voltage 10 Rated speed impeller 11 Weight 12 Nominal...

Page 10: ...lifted when using the suspension point The lifting equipment supplied with the pump as well as the wire used for lifting and lowering the pump into the tank must not be used as universal lifting equip...

Page 11: ...insulator pos C at the top fixation bracket A gap of 5 to 10 mm between collar of epoxy and column profile is optimal See fig 9 8 Remove the epoxy insulator and the turnable metal part by removing the...

Page 12: ...nd frequency are marked on the pump nameplate Make sure that the pump is suitable for the power supply available at the installation site The pump is supplied complete with a supply cable of 10 metres...

Page 13: ...cted to a Grundfos relay type ALR 20 A Ex The ALR 20 A Ex relay must be ordered separately Product number 96489569 For longer distance use an additional screened cable An external alarm indicator if a...

Page 14: ...the motor the impeller should rotate clockwise An arrow on the motor housing shows the correct direction of rotation If the impeller rotates in the wrong direction interchange two phases of the mains...

Page 15: ...een 50 and 75 of the gearbox If required fill oil into the gearbox through the oil filling hole pos 2 For oil quality and quantity see section 9 3 Oil If the pump has been in stock for a period before...

Page 16: ...However any application for service no matter to whom it may be made must include details about the pumped liquid if the pump has been used for liquids which are injurious to health or toxic Warning B...

Page 17: ...edy sleeve and wear ring and replace them in case of wear If the oil contains water replace the mechanical shaft seal Check the oil level twice a year If refilling is required See section 9 3 2 Oil qu...

Page 18: ...ling hole pos 2 Quantity according to section 9 3 2 Oil quantity 8 Refit the screw pos 2 Fig 21 Position of oil drain and oil filling screws Type Gearbox l SRP 08 30 526 1 2 SRP 10 30 606 SRP 13 30 67...

Page 19: ...Grundfos b Different phase voltages Call an electrician c Overload relay is set too low or is faulty Check the overload relay Set the relay to the rated current See section 7 3 Overload relays d Leak...

Page 20: ...id surface Maximum number of starts per hour 20 Enclosure class IP68 Insulation class F Material motor housing Cast iron EN JL 1040 epoxy coated Ambient temperature 0 to 40 C Type Planetary gearbox Ge...

Page 21: ...50 50 291 5 0 200 SRP 65 50 343 6 5 1119 855 996 824 66 670 230 25 240 SRP 80 50 378 8 0 240 SRP 100 50 412 10 250 SRP 70 80 263 7 0 1129 1237 1006 1225 66 1015 267 25 350 SRP 100 80 303 10 360 SRP 12...

Page 22: ...Phone 81 35 448 1391 Telefax 81 35 448 9619 Korea GRUNDFOS Pumps Korea Ltd 6th Floor Aju Building 679 5 Yeoksam dong Kangnam ku 135 916 Seoul Korea Phone 82 2 5317 600 Telefax 82 2 5633 725 Latvia SIA...

Page 23: ...kes it possible Innovation is the essence The name Grundfos the Grundfos logo and the payoff Be Think Innovate are registrated trademarks owned by Grundfos Management A S or Grundfos A S Denmark All r...

Reviews: