11. Setting by means of PC Tool E-products
Special setup requirements differing from the settings available
via the R100 require the use of Grundfos PC Tool E-products.
This again requires the assistance of a Grundfos service
technician or engineer. Contact your local Grundfos company for
more information.
12. Priority of settings
The priority of settings depends on two factors:
1. control source
2. settings.
2. Settings
•
Operating mode
Stop
• Operating mode
Max.
(Max. curve)
• Operating mode
Min.
(Min. curve)
• Setpoint setting.
An E-pump can be controlled by different control sources at the
same time, and each of these sources can be set differently.
Consequently, it is necessary to set an order of priority of the
control sources and the settings.
Priority of settings without bus communication
Example:
If the E-pump has been set to operating mode
Max.
(Max. frequency) via an external signal, such as digital input, the
control panel or R100 can only set the E-pump to operating mode
Stop
.
Priority of settings with bus communication
Example:
If the E-pump is operating according to a setpoint set
via bus communication, the control panel or R100 can set the
E-pump to operating mode
Stop
or
Max.
, and the external signal
can only set the E-pump to operating mode
Stop
.
13. External forced-control signals
The pump has inputs for external signals for these forced-control
functions:
• Start/stop of pump
• Digital function.
13.1 Start/stop input
Functional diagram: Start/stop input:
13.2 Digital input
By means of the R100, one of the following functions can be
selected for the digital input:
•
Normal duty
•
Min. curve
•
Max. curve
•
External fault
•
Flow switch
•
Dry running
.
Functional diagram: Input for digital function
1. Control source
Control panel
R100
External signals
(external setpoint signal, digital inputs, etc.).
Communication from another control system via
bus
1RWH
1RWH
If two or more settings are activated at the same
time, the pump will operate according to the
function with the highest priority.
Priority
Control panel or R100
External signals
1
Stop
2
Max.
3
Stop
4
Max.
5
Min.
Min.
6
Setpoint setting
Setpoint setting
Priority
Control panel
or R100
External
signals
Bus
communication
1
Stop
2
Max.
3
Stop
Stop
4
Max.
5
Min.
6
Setpoint setting
Start/stop (terminals 2 and 3)
Normal duty
Stop
Digital function
(terminals 1 and 9) (terminals 9 and 10) (terminals 9 and 11)
Normal duty
Min. curve
Max. curve
Priority
Control panel
or R100
External
signals
Bus
communication
Q
H
Q
H
Q
H
Q
H
Q
H
DBP-1 - GRUNDFOS PUMP CRE - 99392005
Summary of Contents for SPKE Series
Page 2: ...2...