Table o
f C
on
ten
ts
17.5
Menu OPERATION
45
17.6
Menu STATUS
46
17.7
Menu INSTALLATION
48
18.
Setting by means of PC Tools E-products 55
19.
Priority of setttings
56
19.1
Control without bus signal, local operating 56
mode
19.2
Control with bus signal, remote-controlled 56
operating mode
20.
External control signals
56
20.1
Digital inputs
57
20.2
External setpoint
57
20.3
GENibus signal
57
20.4
Other bus standards 57
21.
CUE Maintenance and service
57
21.1
Cleaning the CUE 57
21.2
Service parts and servie kits
57
22. CUE Troubleshooting
58
22.1 Warning and alarm list
58
22.2 Resetting of alarms
58
22.3 Indicator lights
58
22.4 Signal relays
58
23.
Technical data
59
23.1 Enclosure
59
23.2 Main dimensions and weight
60
23.3 Surroundings
60
23.4 Terminal tightening torques
60
23.5 Cable length
61
23.6 Fuses and cable gauge size
61
23.7 Inputs and putputs
63
23.8
Sound pressure level
63
24.
Disposal
63
25.
CU 352 product description
64
25.1
Indicator lights
64
25.2
Terminals
64
25.3
Potentially explosive environments
64
26.
Identification
65
27.
CU352 installation
65
27.1
Location
66
27.2
Enclosure class
66
27.3
Terminals
66
27.4
Cables
66
28.
CU 352 Installation-Mechanical
66
29.
EMC-correct installation
67
29.1
Internal GENibus connection
68
29.2
Fieldbus communication interface
68
modules
29.3
Fitting the CIM module
69
30.
CU 352 Startup
70
31.
Technical data
70
32.
Electrical data
70
32.1
Supply voltage
70
32.2
Power consumption
70
32.3
Circuit breaker
70
32.4
Backup fuse
70
32.5
Short-circuit protection
70
32.6
Digital inputs
70
32.7
Analog inputs
70
32.8
Digital outputs (relay putputs)
70
32.9
Conductors
70
32.10 USB port
70
32.11
Battery backup (UPS)
71
32.12
Terminal groups
71
33.
Overview of inputs and outputs
72
34.
CU 352 Maintenance
73
35.
CU 352 Service
73
36.
Replacing the CU 352
73
36.1
Replacing the CIM module
73
37.
CU 352 Dimensions
73
38.
CU 352 Disposal
73
39.
Suction diffuser-IOM
74
39.1
Installation
74
39.2
Operation and maintenance
74
39.3
Sectional drawing and components
74
Eng
lish
(US)
2
English (US)
Installation and operating instructions
Original installation and operating instructions.
CONTENTS
Page
1. Symbols used in this document
The following symbols may be used in this document.
2. Terms and Conditions
2.1 The contract
The Contract shall be comprised of the following terms, together
with such terms and conditions as are set forth in Seller's written
proposal or quotation (the "Quotation"), including any documents,
drawings or specifications incorporated therein by reference, and
any additional or different terms proposed in Buyer's purchase
order (the "Purchase Order") that are accepted by Seller in
writing, which together shall constitute the entire agreement
between the parties, provided, however, that preprinted terms on
Buyer's purchase order or invoice shall not apply and Seller gives
notice of objection to such terms. An offer by Seller in its
Quotation that does not stipulate an acceptance date is not
binding. This Contract shall be deemed to have been entered into
upon written acknowledgment of the Purchase Order by an officer
or authorized representative of Seller, which may not be modified,
supplemented, or waived except in a writing executed by an
authorized representative of the party to be bound.
1.
Symbols used in this document
2
2.
Terms and Conditions
2
2.1
The contract
2
2.2
Price
3
2.3
Payment terms
3
2.4
Acceptance and inspection
3
2.5
Title and risk of loss
3
2.6
Patent or trademark information
3
2.7
Changes
3
2.8
Cancellation or termination
3
2.9
Delivery and delays
3
2.10 Warranty
4
2.11 Technical documents
4
2.12 Limitation of liability
4
2.13 This company is an equal opportunity employer
4
2.14 law and arbitration
5
3.
Installation - Mechanical
5
3.1
Pump identification
5
3.2
Receiving
5
3.3
Temporary storage
5
3.4
Location
5
3.5
Horizontal pump foundation
5
3.6
Securing base plate
6
3.7
Vertical mounting instructions
6
3.8
Piping-general
6
3.9
Suction (inlet) piping
6
3.10 Discharge (outlet) piping
7
3.11 Shaft sealing-general comments
7
3.12 Packing gland adjustment
7
3.13 Mechanical seals
7
3.14 Coupling alignment (LF)
8
3.15 Coupling alignment (LCS)
8
4.
Installation-electrical
8
4.1
Motors general
8
4.2
Installation wiring
8
5.
Operation
9
5.1
Priming
9
5.2
Pre-start checklist
9
5.3
Motor rotation
9
5.4
Starting the pump
9
5.5
Voltage regulation
10
5.6
Pump shutdown
10
5.7
Short duration shutdown
10
5.8
Extended period shutdown
10
6.
Maintenance
10
6.1
Motor lubrication
10
6.2
Pump lubrication
11
6.3
Disassembly of pumps
12
6.3.1 Disassembly of liquid end
12
6.3.2 Disassembly of bearing frame (LF)
12
6.4
Seal replacement (LCS)
12
6.5
Wear ring replacement
12
6.6
Reassembly of pumps
13
6.7
Ordering parts
13
6.8
Type LF, cross section and parts list
14
6.9
Type LC, cross section and parts list
15
6.10 Type LCV, cross section and parts list
16
6.11 Type LCS, cross section and parts
17
7.
Trouble Shooting
18
7.1
Symptom
18
7.2
Possible Causes
18
Warning
If these safety instructions are not observed,
it may result in personal injury.
Warning
If these instructions are not observed, it may lead
to electric shock with consequent risk of serious
personal injury or death.
Warning
When pumping hazardous liquids, special
attention must be paid to the risk of personal
injury.
Warning
The surface of the product may be so hot that
it may cause burns or personal injury.
Warning
The sound pressure level is so high that hearing
protection must be used.
Caution
If these safety instructions are not observed,
it may result in malfunction or damage to the
equipment.
Note
Note
Notes or instructions that make the job easier
and ensure safe operation.
3